== Arm Cavity Finesse ==
We will change the transmission of the ITMs from 0.5% to 1.4% to match the new AdvLIGO design.
## page was renamed from Upgrade 08
== Upgrade of the 40m ==
 * '''[[Upgrade 09/Overview|Overview ~]]'''
 * '''Upgrade items & Preparation status'''
  * [[Upgrade 09/Configuration|Optical Configuration]]
   * [[Upgrade 09/Optical Layout|Optical Layout]]
   * [[Upgrade 09/GreenLock|Green Locking]]
   * [[Upgrade 09/ArmNaming|Arm Battesimo]]
  * [[Upgrade 09/Optics|Optics ~]]
   * [[Upgrade 09/Main Optics Phase Maps|Phase Maps of the main mirrors]]
   * [[Optics Cleaning|Optics Cleaning Plan (Dec 2009)]]
   * [[Upgrade 09/MMT09|New Input Mode Matching]]
  * Mechanics
   * [[Upgrade 09/Suspensions|Suspensions ~ SOSs and TTs]]
  * Electronics
   * [[Upgrade 09/RF System|RF System]]
   * [[Upgrade 09/Multi Resonant EOM|Multi Resonant EOM]]
  * [[Upgrade 09/PSL|New PSL Layout]]
  * [[Upgrade 09/CDS|New CDS]]
  * [[Upgrade 09/Purchase List|Purchase List]]
 * '''[[Upgrade 09/Installation Plan|Installation Plan ~]]'''
Line 4: Line 23:
We will also replace the MOS (with 1.25 kg masses) with SOSs. This is to increase the effect of radiation pressure. == Events ==
 * '''May 2X, 2010:''' First Green Locking of the arm
 * '''Apr 23, 2010:''' First SHG light at the 40m for this upgrade
 * '''Apr 13, 2010:''' PRM/SRM removal form the table
 * '''Apr 12, 2010:''' ITMX SOS installation completed
 * '''Apr 6, 2010:''' ITMY SOS installation completed
 * '''Mar 2, 2010:''' Vent
 * '''Feb 20, 2010:''' [[Power Shortage Feb 2010|Power supply stop]]
 * '''Jan 28, 2010:''' [[TAC Meeting-Jan 10|TAC meeting Jan 2010]]
 * '''Dec 7-11, 2009:''' [[Optics Cleaning|Vent for test mass cleaning]]
 * '''Nov 12-17, 2009:''' ETMY CDS test
Line 6: Line 35:
We will not fine-tune the coatings of the ITMs for cool dichroic properties unless some coating place gives us a <4 month lead time. == TAC (Technical Advisory Comittee) meetings ==
 * [[TACs|TAC meetings]]
Line 8: Line 38:
== Modulation Frequencies ==
We will change the modulation frequencies from f1=33 MHz and f2 = 166 MHz to f1 = 9 MHz and f2 = 45 MHz. We will increase the length of the MC to accomodate this.

== Recycling Cavities ==
We will increase the length of the RCs to handle the lower modulation frequency. This will require 2 tip/tilt mirrors per cavity. These will be imperial, eddy current damped versions of the ANU tip/tilt mirrors.

Should we get new PR and SR or use what we have? (curvature, reflectivity). Maybe we should match the AdvLIGO Gouy phases.

We will make the tip/tilts so that we can have a POP signal. We also keep POX & POY.

== Mach Zender ==
We will not use a Mach Zender. We will use 2-3 EOMs in series or a UF Trimod if it shows up.

== Control System Computers ==
We will have a big multi-core box to run all of the front ends. It will have fast fiber links to remote ADC/DACs.

== Multi-wavelength Locking ==
Make wedges and coatings to accomodate multi-color locking if the lead time is reasonable. The beam from the end should not see the corner.

== Optical Levers ==
Make a fiber based OL delivery scheme. Try to also make 40m long OLs by putting turning mirrors into the vacuum system.

== Analog Electronics ==

=== Suspensions ===
No change of the suspension analog electronics. We will have interface cards/connectors to go from new style ADC/DACs into the old analog electronics.

=== LSC ===
New RFPDs for the 9 & 45 MHz as well as 3*f1 (27 MHz). Maybe DD as well.

== Cameras ==
We'll have GigE cameras and an all GigE backbone for all CDS connections.
== Upgrade documents ==
 * [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=231 Upgrade Doc in DCC]
 * [http://lhocds.ligo-wa.caltech.edu:8000/advligo/ISC_Modeling_Software/CVSinstructions?highlight=(CVS) "MIT CVS repository instructions for accessing AdvLIGO modeling"]
 * 40m upgarde plan scrutiny Ver. 9/29/2009 [attachment:upgrade09_090929.pdf [PDF]][attachment:upgrade09_090929.graffle [OmniGraffle]]
 * 40m upgarde status Ver. 1/06/2010 [attachment:100106_upgrade09.pdf [PDF]][attachment:100106_upgrade09.graffle [OmniGraffle]]
 * 40m upgrade status (KA, '10 March LVC) [attachment:LVC_March_40m_karai_100315.pdf [PDF]] [attachment:LVC_March_40m_karai_100315.tar.gz [tgzed graffle file ]]

Upgrade of the 40m

Events

  • May 2X, 2010: First Green Locking of the arm

  • Apr 23, 2010: First SHG light at the 40m for this upgrade

  • Apr 13, 2010: PRM/SRM removal form the table

  • Apr 12, 2010: ITMX SOS installation completed

  • Apr 6, 2010: ITMY SOS installation completed

  • Mar 2, 2010: Vent

  • Feb 20, 2010: Power supply stop

  • Jan 28, 2010: TAC meeting Jan 2010

  • Dec 7-11, 2009: Vent for test mass cleaning

  • Nov 12-17, 2009: ETMY CDS test

TAC (Technical Advisory Comittee) meetings

Upgrade documents