|
Size: 1476
Comment:
|
Size: 578
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 1: | Line 1: |
| == Arm Cavity Finesse == We will change the transmission of the ITMs from 0.5% to 1.4% to match the new AdvLIGO design. |
= Upgrade of the 40m = This is a collection of links relating to the 2008 40m Upgrade. |
| Line 4: | Line 4: |
| We will also replace the MOS (with 1.25 kg masses) with SOSs. This is to increase the effect of radiation pressure. | ||[[/Overview]]|| [[/Optics]] || [[/CDS]] || [[/Suspensions]] || |
| Line 6: | Line 6: |
| We will not fine-tune the coatings of the ITMs for cool dichroic properties unless some coating place gives us a <4 month lead time. == Modulation Frequencies == We will change the modulation frequencies from f1=33 MHz and f2 = 166 MHz to f1 = 9 MHz and f2 = 45 MHz. We will increase the length of the MC to accomodate this. == Recycling Cavities == We will increase the length of the RCs to handle the lower modulation frequency. This will require 2 tip/tilt mirrors per cavity. These will be imperial, eddy current damped versions of the ANU tip/tilt mirrors. Should we get new PR and SR or use what we have? (curvature, reflectivity) == Mach Zender == We will not use a Mach Zender. We will use 2-3 EOMs in series or a UF Trimod if it shows up. == Control System Computers == We will have a big multi-core box to run all of the front ends. It will have fast fiber links to remote ADC/DACs. == Multi-wavelength Locking == Make wedges and coatings to accomodate multi-color locking if the lead time is reasonable. The beam from the end should not see the corner. == Optical Levers == Make a fiber based OL delivery scheme. Try to also make 40m long OLs by putting turning mirrors into the vacuum system. |
== Upgrade document == * [[TAC Meeting-Apr 08]] ([http://lhocds.ligo-wa.caltech.edu:8000/40m/TAC_Meeting-Apr_08?action=AttachFile&do=get&target=Upgrade08.pdf Upgrade08.pdf], or [https://40m.ligo.caltech.edu/svn/40m/docs/upgrade08/ SVN repository]) * [http://lhocds.ligo-wa.caltech.edu:8000/advligo/ISC_Modeling_Software/CVSinstructions?highlight=%28CVS%29 "MIT CVS repository instructions for accessing AdvLIGO modeling"] |
Upgrade of the 40m
This is a collection of links relating to the 2008 40m Upgrade.
Upgrade document
TAC Meeting-Apr 08 ([http://lhocds.ligo-wa.caltech.edu:8000/40m/TAC_Meeting-Apr_08?action=AttachFile&do=get&target=Upgrade08.pdf Upgrade08.pdf], or [https://40m.ligo.caltech.edu/svn/40m/docs/upgrade08/ SVN repository])
[http://lhocds.ligo-wa.caltech.edu:8000/advligo/ISC_Modeling_Software/CVSinstructions?highlight=%28CVS%29 "MIT CVS repository instructions for accessing AdvLIGO modeling"]
