== Arm Cavity Finesse ==
We will change the transmission of the ITMs from 0.5% to 1.4% to match the new AdvLIGO design.
## page was renamed from Upgrade 08
Line 4: Line 3:
We will also replace the MOS (with 1.25 kg masses) with SOSs. This is to increase the effect of radiation pressure. == Upgrade of the 40m ==
Line 6: Line 5:
We will not fine-tune the coatings of the ITMs for cool dichroic properties unless some coating place gives us a <4 month lead time.  * '''[[/Overview|Overview]]'''
 * '''Upgrade items & Preparation status'''
  * [[/Configuration|Configuration]]
  * [[/Optics|Optics]]
  * [[/CDS|CDS]]
  * [[/Suspensions|Suspensions]]
  * [[/Optical Layout|Optical Layout]]
  * [[/PDs|RF System]]
  * [[/Multi_Resonant_EOM|Multi_Resonant_EOM]]
  * [[/GreenLock|Green Locking]]
  * [[/Purchase List|Purchase List]]
Line 8: Line 17:
== Modulation Frequencies ==
We will change the modulation frequencies from f1=33 MHz and f2 = 166 MHz to f1 = 9 MHz and f2 = 45 MHz. We will increase the length of the MC to accomodate this.

== Recycling Cavities ==
We will increase the length of the RCs to handle the lower modulation frequency. This will require 2 tip/tilt mirrors per cavity. These will be imperial, eddy current damped versions of the ANU tip/tilt mirrors.

Should we get new PR and SR or use what we have? (curvature, reflectivity)

== Mach Zender ==
We will not use a Mach Zender. We will use 2-3 EOMs in series or a UF Trimod if it shows up.

== Control System Computers ==
We will have a big multi-core box to run all of the front ends. It will have fast fiber links to remote ADC/DACs.

== Multi-wavelength Locking ==
Make wedges and coatings to accomodate multi-color locking if the lead time is reasonable. The beam from the end should not see the corner.

== Optical Levers ==
Make a fiber based OL delivery scheme. Try to also make 40m long OLs by putting turning mirrors into the vacuum system.
== Upgrade documents ==
 * [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=231 Upgrade Doc in DCC]
 * [http://lhocds.ligo-wa.caltech.edu:8000/advligo/ISC_Modeling_Software/CVSinstructions?highlight=(CVS) "MIT CVS repository instructions for accessing AdvLIGO modeling"]
 * 40m upgarde plan scrutiny Ver. 9/29/2009 [attachment:upgrade09_090929.pdf [PDF]][attachment:upgrade09_090929.graffle [OmniGraffle]]

Upgrade of the 40m

Upgrade documents

Upgrade_09 (last edited 2012-01-03 23:02:41 by localhost)