Differences between revisions 3 and 19 (spanning 16 versions)
Revision 3 as of 2010-08-07 03:25:22
Size: 333
Editor: KojiArai
Comment:
Revision 19 as of 2010-08-09 09:36:52
Size: 2092
Editor: KojiArai
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
<<TableOfContents(2)>> <<TableOfContents(3)>>
Line 7: Line 7:
 * We are going to lift the table by
Line 13: Line 11:
== == Drawing for the leg positions ==
Line 15: Line 13:
- Their planned positions shown below. - The planned positions of the legs are shown below.

<<ImageLink(psllegs.png,Upgrade 09/PSL Table Lifting,width=400)>>

== Work schedule ==

attachment:PSL_work_schedule.png
attachment:PSL_work_schedule.pdf

== Cable Removal ==

attachment:PSL_cable_map.pdf

== Work Log ==

=== Aug 5th ===
10am-4pm?: (Kiwamu, Alberto, Koji)

    * Removing the unused cables around the PSL table and the control room

=== Aug 6th ===

10am-5pm: (Steve, Jenne, Alberto, Kiwamu, Koji)

 * We labeled the cables to be disconnected

    * These will be disconnected in order to isolate the PSL table and the frame (housing) from the other part of the lab.
    * Upon the labeling we made the list and the map of the cables to be removed.
    * On Monday we disconnect those cables one by one accoding to the list.

 * The following stuffs have been removed from the PSL table

    * The big nuts at the side of the PSL table
    * The cable ties on the PSL frame
    * Innolight 2W
    * The green pickoff optics at the edge
    * The optics on the shelf
    * The oscilloscopes on the shelf

 * The OMC power supply cable was visited.

    * The connections to the power supply were removed. There are two HV outputs.

 * We put thick and long optical poles

    * They are placed at the edge of the table so that we can put the plastic sheets on the table without touching the optics.

=== Aug 9th ===

9am-5pm: (Steve, Jenne, Alberto, Koji)

    * Disconnecting the cables ==> All
    * Shutting down the PSL ==> Steve/Koji
          o Draining the cooling water ==> Steve
    * Removals
          o The accelerometers ==> Jenne
          o The reference cavity chamber ==> Steve
          o The small periscope ==> Alberto
    * Sealing of the table with the plastic sheets

    * The chiller is planned to go to MIT

PSL Table Lifting

Overview

  • The PSL table height will be raised to the level of the AP table.
  • This will be done using 6 TMC's Rigid Damped Tripod legs.
  • The legs will be grouted to the floor with concrete.

Drawing for the leg positions

- The planned positions of the legs are shown below.

psllegs.png

Work schedule

attachment:PSL_work_schedule.png attachment:PSL_work_schedule.pdf

Cable Removal

attachment:PSL_cable_map.pdf

Work Log

Aug 5th

10am-4pm?: (Kiwamu, Alberto, Koji)

  • Removing the unused cables around the PSL table and the control room

Aug 6th

10am-5pm: (Steve, Jenne, Alberto, Kiwamu, Koji)

  • We labeled the cables to be disconnected
    • These will be disconnected in order to isolate the PSL table and the frame (housing) from the other part of the lab.
    • Upon the labeling we made the list and the map of the cables to be removed.
    • On Monday we disconnect those cables one by one accoding to the list.
  • The following stuffs have been removed from the PSL table
    • The big nuts at the side of the PSL table
    • The cable ties on the PSL frame
    • Innolight 2W
    • The green pickoff optics at the edge
    • The optics on the shelf
    • The oscilloscopes on the shelf
  • The OMC power supply cable was visited.
    • The connections to the power supply were removed. There are two HV outputs.
  • We put thick and long optical poles
    • They are placed at the edge of the table so that we can put the plastic sheets on the table without touching the optics.

Aug 9th

9am-5pm: (Steve, Jenne, Alberto, Koji)

  • Disconnecting the cables ==> All

  • Shutting down the PSL ==> Steve/Koji

    • o Draining the cooling water ==> Steve

  • Removals
    • o The accelerometers ==> Jenne o The reference cavity chamber ==> Steve o The small periscope ==> Alberto

  • Sealing of the table with the plastic sheets
  • The chiller is planned to go to MIT