Differences between revisions 22 and 23
Revision 22 as of 2010-08-13 01:56:22
Size: 3176
Editor: KojiArai
Comment:
Revision 23 as of 2012-01-03 23:03:06
Size: 3298
Editor: localhost
Comment: converted to 1.6 markup
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
<<ImageLink(psllegs.png,Upgrade 09/PSL Table Lifting,width=400)>> [[Upgrade 09/PSL Table Lifting|{{attachment:psllegs.png||width=400}}]]
Line 19: Line 19:
attachment:PSL_work_schedule.png
attachment:PSL_work_schedule.pdf
{{attachment:PSL_work_schedule.png}}
[[attachment:PSL_work_schedule.pdf]]
Line 24: Line 24:
attachment:PSL_cable_map.pdf [[attachment:PSL_cable_map.pdf]]

PSL Table Lifting

Overview

  • The PSL table height will be raised to the level of the AP table.
  • This will be done using 6 TMC's Rigid Damped Tripod legs.
  • The legs will be grouted to the floor with concrete.

Drawing for the leg positions

- The planned positions of the legs are shown below.

Upgrade 09/PSL Table Lifting

Work schedule

PSL_work_schedule.png PSL_work_schedule.pdf

Cable Removal

PSL_cable_map.pdf

Work Log

Aug 5th

10am-4pm?: (Kiwamu, Alberto, Koji)

  • Removing the unused cables around the PSL table and the control room

Aug 6th

10am-5pm: (Steve, Jenne, Alberto, Kiwamu, Koji)

  • We labeled the cables to be disconnected
    • These will be disconnected in order to isolate the PSL table and the frame (housing) from the other part of the lab.
    • Upon the labeling we made the list and the map of the cables to be removed.
    • On Monday we disconnect those cables one by one accoding to the list.
  • The following stuffs have been removed from the PSL table
    • The big nuts at the side of the PSL table
    • The cable ties on the PSL frame
    • Innolight 2W
    • The green pickoff optics at the edge
    • The optics on the shelf
    • The oscilloscopes on the shelf
  • The OMC power supply cable was visited.
    • The connections to the power supply were removed. There are two HV outputs.
  • We put thick and long optical poles
    • They are placed at the edge of the table so that we can put the plastic sheets on the table without touching the optics.

Aug 9th

9am-5pm: (Steve, Jenne, Alberto, Koji)

  • Disconnecting the cables ==> All

  • Shutting down the PSL ==> Steve/Koji

    • o Draining the cooling water ==> Steve

  • Removals
    • o The accelerometers ==> Jenne o The reference cavity chamber ==> Steve o The small periscope ==> Alberto

  • Sealing of the table with the plastic sheets
  • The chiller is planned to go to MIT

Aug 10th

10am-2pm: (Steve, Mike, Koji)

  • Lifting of the PSL frame
  • Lifting of the PSL table
  • Putting Al legs and tie them to the frame bars with steel hose clamps
  • Attach the template board to the bottom surface of the PSL table with the C-clamps

Aug 11th

9am-12pm: (Steve, Caltech Carpentar)

  • Drilling and tapping of the eighteen 1/4-20 holes to the bottom surface of the table

3:30pm-4:30pm: (Katharine, Sharmila, Gopal, Kiwamu, Jenne, Aidan, Steve, and Koji)

  • Wrapping up the central part of the interferometer with plastic sheets

Aug 12th

9am-2pm: (Steve, Bertin Bros. Construction, Inc)

  • Powered down 1Y1 and 1Y2 instrument racks of MC and RF-systems
  • Covers the both racks, the SP table with plastics.
  • Bertin Bros. Construction, Inc worked on the floor preparation. (The head man: Robby Bertin, cell 626.831.2264)
    • removed tiles
    • cleaned off tile glue,
    • drilled for ribbed steel bars
    • roughed clean-surface for good bounding.
    • painted floor with bounding agent

Upgrade_09/PSL_Table_Lifting (last edited 2012-01-03 23:03:06 by localhost)