Differences between revisions 3 and 7 (spanning 4 versions)
Revision 3 as of 2009-10-31 02:15:25
Size: 1440
Editor: KojiArai
Comment:
Revision 7 as of 2009-10-31 02:38:21
Size: 1542
Editor: KojiArai
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
## page was renamed from Upgrade 08/Overview <<TableOfContents([2])>>
-----
Line 3: Line 4:
-----
Line 4: Line 6:
=== Prototyping of AdvLIGO LSC === === Prototyping of AdvLIGO LSC ===
Line 13: Line 15:
=== Tuned / Detuned RSE comparison === === Tuned / Detuned RSE comparison ===
Line 17: Line 19:
=== RGC based digital control system === === RGC based digital control system ===
Line 21: Line 23:
-----
Line 22: Line 25:
=== DC&Dither technologies === === DC&Dither technologies ===
Line 27: Line 30:
=== Interferometer Diagnosis ===
     Cavity characterization using aux. laser injection
     "Provide a method of precise in-situ characterization of the interferometer"
=== Interferometer Diagnosis ===
 * Cavity characterization using aux. laser injection
  * "Provide a method of precise in-situ characterization of the interferometer"
Line 31: Line 34:
- Development / test bench of advanced technologies
    
GigE CCD WFS technique
     Adaptive noise cancellation
     "Demonstrate how it works"
     "Understand and improve its limitations"
=== ►Development / test bench of advanced technologies ===
 *
GigE CCD WFS technique
 * Adaptive noise cancellation
  * "Demonstrate how it works"
  * "Understand and improve its limitations"

-----
-----

= Major things to be upgraded =
-----
== Interferometer Configuration ==

== CDS (Control and Data System) ==

<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[2]"] (see also the log)>>


Purpose of the upgrade


Demonstration of the AdvLIGO interferometer technologies

►Prototyping of AdvLIGO LSC

  • Lock acquisition

    • "Prove AdvLIGO LSC actually works"
  • Green laser locking

    • "Realize lock of the arms independently from the main beam"
    • "Achieve semi-deterministic lock & smooth handing off"

  • Noise mechanisms / DC readout

    • "Discover and/or confirm by a model RSE specific noise couplings"

►Tuned / Detuned RSE comparison

  • "Address advantage and disadv. of the tuned/detuned configuration"
  • "Demonstrate smooth transition"

►RGC based digital control system

  • "Demonstrate complicated LSC code on the connected multiple systems"
  • "Establish rapid prototyping methods with simulated plants on the processors"


To do anything useful to make the AdvLIGO easier / faster

►DC&Dither technologies

  • Offset lock and handoffs
  • AF WFS technique
    • "Develop and characterize various new useful techniques"

►Interferometer Diagnosis

  • Cavity characterization using aux. laser injection
    • "Provide a method of precise in-situ characterization of the interferometer"

►Development / test bench of advanced technologies

  • GigE CCD WFS technique
  • Adaptive noise cancellation
    • "Demonstrate how it works"
    • "Understand and improve its limitations"



Major things to be upgraded


Interferometer Configuration

CDS (Control and Data System)

Upgrade_09/Overview (last edited 2012-01-03 23:02:40 by localhost)