|
Size: 366
Comment:
|
Size: 243
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 7: | Line 7: |
| * Measure noise on "Rai's Low Noise Pre Amp" * Make relief-to-sliders scripts for ASS system * Make low pass filter for SPOB |
General projects: * CO2 Laser Stabilization * [[ASS]] |
| Line 11: | Line 11: |
| Useful links: * [http://lhocds.ligo-wa.caltech.edu:8000/mLIGO/Thermal_Compensation_System Enhanced LIGO TCS] |
== Temporary stuff == |
| Line 14: | Line 13: |
| attachment:connector1.jpg attachment:connector2.jpg |
Tobin Fricke
Things for Tobin to do:
General projects:
- CO2 Laser Stabilization
Temporary stuff
attachment:connector1.jpg attachment:connector2.jpg
