This is the Phantasmical To Do list for the 40m lab:

In-lock alignment (ASS)

Transfer function characterization

This follows the item above, and everyone will be interested in the results. We need to characterize the:

Main commissioning tasks

Noise budget

Controls

- Are all controls drawings (PDFs) up-to-date on Ben & Jay's web sites?

PSL

* Modify ISS to make the DAQ signals fit in the ADC (110B has a +/- 2V range)

MC, MZ

SUS, LSC, ASC

- OSEM sensor glitches: still have them?

- OSEM problems diagnosed by checkosem script.

- Can't put excitations into SIDE OSEM channels.

Computers:

DC readout

Other:

- beamline as-built documentation. Update ACad drawings.

- cranes - overheating, failures.

- gutters on building.

Ground Loops