This is the Phantasmical To Do list for the 40m lab: ( severely shortened Jan. 7, 2007 RA)
--In-lock alignment (This is a big one)
Rolf & Alex are working on a new ASC code to do all IFO dither alignment based on Bram and Valera's design.
--Transfer function characterization
- This follows the item above, and everyone will be interested in the results. We need to characterize the: RSE peak optical spring coupled cavity response all open loop gains/cross coupling of signals frequency noise coupling. Finesse has shown some unexpected transfer functions to places other than the DARM signal; we should investigate these. other CARM transfer functions to non-traditional signal ports
--Ground loop
Power supplies, racks, optical tables, chambers, LSC PDs, cables etc. ** <b>Get rid of all these long cables to the control room !!</b>
Main commissioning tasks (all **) - Noise budget
> Download the sites' noise budget via CVS and adapt to 40m based on Osamu/David/Ryan's work.
_ Controls: - Replace c1losepics/c1iscepics temporary cpu with permanent one - c1susvme2 sometimes loses time synch. - Replace framebuilder RAID array with fiber link to QFS system. - LSC front end cpu starts to creep up towards 61 usec. - QPD Whitening boards: whitening filters aren't switching. - Protect the front end code against NaNs from ezcademod and we need to prevent ezcademod from spitting out NaNs (and find out what causes it to do so in the first place). Rolf, Rob. - vacuum breakdown trigger failed to act at 3.7 mTorr on IOO pzts _OMC pzts have to be protected also -V1 valve interlock still does not exits! - Vacuum EPICS screen: TP on/off logic; TP readout; - Front end code slows down considerably when AWG is running? - LSC rack power is inadequate. Redo the system, add Sorensens? - Coupling between LSC IQDemod boards and whitening boards: - Convert all RFPD DC signals to their LSC PD Interface version, - The new fiber timing system from Sander seems to be working ok. - Still have big 60 Hz problems. - Fast DAQ signals from 1Y2. - Linux framebuilder? - Are all controls drawings (PDFs) up-to-date on Ben & Jay's web sites?
_ PSL: - Work on the PSLwatch script to handle all the PSL servo state logic.
- Modify ISS to make the DAQ signals fit in the ADC (110B has a +/- 2V range)
_ MC, MZ: - How about that RF multiplier circuit?
_ SUS, LSC, ASC:
- OSEM sensor glitches: still have them?
- They were isolated to be originating in ICS100b or the VME crate itself. Due to crate 5V power supply?? Rolf has a fix, used at HEPI?
- OSEM problems diagnosed by checkosem script.
- Why are ETMX and ETMY OSEM monitors different from the rest? Why is there an abnormal sign flip on ETMX side?
- Can't put excitations into SIDE OSEM channels.
- Jay, Rolf?
_ Computers: - We can't print to hp2550 from any of the operator consoles except linux3. - Review the stuff in ALH to see if
_ DC readout (all **):
Other:
- beamline as-built documentation. Update ACad drawings.
- Mike, all.
- cranes - overheating, failures.
- Temporary solution: don't run in standby mode. Ben.
- gutters on building.
- Steve.
- replace leaky valve on roughing pump.
- Steve.
- give CaJAGWR attachment:Kirk_CaJAGWR_281106.ppt . attachment:sweep_xarm_ASI166.txt attachment:sweep_xarm_POX33.txt attachment:sweep_xarm_ASI166_23Jan.txt attachment:sweep_xarm_POXI33_23Jan.txt attachment:sweep_yarm_ASQ166_23Jan.txt attachment:sweep_yarm_POYI33_23Jan.txt
kirk