|
Size: 4657
Comment:
|
Size: 2419
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 2: | Line 2: |
| ( severely shortened Jan. 7, 2007 RA) | |
| Line 4: | Line 3: |
| --In-lock alignment (This is a big one) Rolf & Alex are working on a new ASC code to do all IFO dither alignment based on Bram and Valera's design. |
<<TableOfContents()>> = In-lock alignment (ASS) = Get this system to actually work in a useful manner. The computer hardware is all there, we're just lacking person-and-will-power. |
| Line 8: | Line 7: |
| --Transfer function characterization This follows the item above, and everyone will be interested in the results. We need to characterize the: |
= Transfer function characterization = This follows the item above, and everyone will be interested in the results. We need to characterize the: |
| Line 12: | Line 11: |
| RSE peak optical spring coupled cavity response all open loop gains/cross coupling of signals frequency noise coupling. Finesse has shown some unexpected transfer functions to places other than the DARM signal; we should investigate these. other CARM transfer functions to non-traditional signal ports |
* RSE peak * optical spring * coupled cavity response * all open loop gains/cross coupling of signals * frequency noise coupling. Finesse has shown some unexpected transfer functions to places other than the DARM signal; we should investigate these. * other CARM transfer functions to non-traditional signal ports |
| Line 20: | Line 19: |
| --Ground loop Power supplies, racks, optical tables, chambers, LSC PDs, cables etc. ** <b>Get rid of all these long cables to the control room !!</b> Main commissioning tasks (all **) - Noise budget > Download the sites' noise budget via CVS and adapt to 40m based on Osamu/David/Ryan's work. ___ Controls: - Replace c1losepics/c1iscepics temporary cpu with permanent one that doesn't have a DHCP server running! Rolf, Alex, Jay. ** - c1susvme2 sometimes loses time synch. Alex? - Replace framebuilder RAID array with fiber link to QFS system. Rolf, Stuart, Larry. - LSC front end cpu starts to creep up towards 61 usec. 16 Hz and harmonics appear everywhere. Rob, Rolf, Alex. ** - QPD Whitening boards: whitening filters aren't switching. Ben, Alex. ** - Protect the front end code against NaNs from ezcademod and we need to prevent ezcademod from spitting out NaNs (and find out what causes it to do so in the first place). Rolf, Rob. - vacuum breakdown trigger failed to act at 3.7 mTorr on IOO pzts _OMC pzts have to be protected also -V1 valve interlock still does not exits! - Vacuum EPICS screen: TP on/off logic; TP readout; EPICS state code for reading out TP3 and IPs, and for protecting/closing V1 if TP1 starts to fail. Jay, Dan. - Front end code slows down considerably when AWG is running? Hasn't seemed to be a problem lately... - LSC rack power is inadequate. Redo the system, add Sorensens? Jay? - Coupling between LSC IQDemod boards and whitening boards: Add power regulators. Add heat sinks. Ben. ** - Convert all RFPD DC signals to their LSC PD Interface version, eliminate deticated DC cable (which causes ground loops). Ben. ** - The new fiber timing system from Sander seems to be working ok. When the sites convert to a new system, we should too! - Still have big 60 Hz problems. Draw up ground loop plan, including proper grounding of rack power supplies; implement. Ben. ** - Fast DAQ signals from 1Y2. Are they all being read in and logged correctly, falling in meaningful range? Ben. - Linux framebuilder? Rolf? Alex? |
= Main commissioning tasks = == Noise budget == * Download the sites' noise budget via CVS and adapt to 40m based on Osamu/David/Ryan/Max's work. == Controls == * Replace framebuilder RAID array with fiber link to QFS system. Rolf, Stuart, Larry. * QPD Whitening boards: whitening filters aren't switching. Ben, Alex. ** * Protect the front end code against NaNs from ezcademod and we need to prevent ezcademod from spitting out NaNs (and find out what causes it to do so in the first place). Rolf, Rob. * Coupling between LSC IQDemod boards and whitening boards: Add power regulators. Add heat sinks. Ben. ** |
| Line 78: | Line 32: |
| ___ PSL: - Work on the PSLwatch script to handle all the PSL servo state logic. |
|
| Line 82: | Line 33: |
| - Modify ISS to make the DAQ signals fit in the ADC (110B has a +/- 2V range) ___ MC, MZ: - How about that RF multiplier circuit? This requires making some RF filters to put in between the stages to reduce the intermodulation peaks. WE should also think about the requirements on the spectral purity of these signals. ___ SUS, LSC, ASC: |
= PSL = * Modify ISS to make the DAQ signals fit in the ADC (110B has a +/- 2V range) = MC, MZ = = SUS, LSC, ASC = |
| Line 101: | Line 44: |
| Why are ETMX and ETMY OSEM monitors different from the rest? Why is there an abnormal sign flip on ETMX side? |
|
| Line 107: | Line 48: |
| ___ Computers: | = Computers: = |
| Line 110: | Line 50: |
| - We can't print to hp2550 from any of the operator consoles except linux3. Alex. ** |
* Make [[GPIB]] work, so that we can use our USB-GPIB dongle to get data directly off of the SR785 and other instruments |
| Line 113: | Line 52: |
| - Review the stuff in ALH to see if important things are missing or unimportant things are present. |
= DC readout = |
| Line 116: | Line 54: |
| ___ DC readout (all **): ____ Other: |
= Other: = |
| Line 132: | Line 66: |
| - replace leaky valve on roughing pump. Steve. |
|
| Line 135: | Line 67: |
| - give CaJAGWR attachment:Kirk_CaJAGWR_281106.ppt . attachment:sweep_xarm_ASI166.txt attachment:sweep_xarm_POX33.txt kirk |
== Ground Loops == * Power supplies, racks, optical tables, chambers, LSC PDs, cables etc. * Get rid of all these long cables to the control room !! |
This is the Phantasmical To Do list for the 40m lab:
Contents
In-lock alignment (ASS)
- Get this system to actually work in a useful manner. The computer hardware is all there, we're just lacking person-and-will-power.
Transfer function characterization
This follows the item above, and everyone will be interested in the results. We need to characterize the:
- RSE peak
- optical spring
- coupled cavity response
- all open loop gains/cross coupling of signals
- frequency noise coupling. Finesse has shown some unexpected transfer functions to places other than the DARM signal; we should investigate these.
- other CARM transfer functions to non-traditional signal ports
Main commissioning tasks
Noise budget
- Download the sites' noise budget via CVS and adapt to 40m based on Osamu/David/Ryan/Max's work.
Controls
- Replace framebuilder RAID array with fiber link to QFS system. Rolf, Stuart, Larry.
- QPD Whitening boards: whitening filters aren't switching. Ben, Alex. **
Protect the front end code against NaNs from ezcademod and we need to prevent ezcademod from spitting out NaNs (and find out what causes it to do so in the first place). Rolf, Rob.
- Coupling between LSC IQDemod boards and whitening boards: Add power regulators. Add heat sinks. Ben. **
- Are all controls drawings (PDFs) up-to-date on Ben & Jay's web sites?
- LSC? ASC? SUS? Ends?
PSL
* Modify ISS to make the DAQ signals fit in the ADC (110B has a +/- 2V range)
MC, MZ
SUS, LSC, ASC
- OSEM sensor glitches: still have them?
- They were isolated to be originating in ICS100b or the VME crate itself. Due to crate 5V power supply?? Rolf has a fix, used at HEPI?
- OSEM problems diagnosed by checkosem script.
- Can't put excitations into SIDE OSEM channels.
- Jay, Rolf?
Computers:
Make GPIB work, so that we can use our USB-GPIB dongle to get data directly off of the SR785 and other instruments
DC readout
Other:
- beamline as-built documentation. Update ACad drawings.
- Mike, all.
- cranes - overheating, failures.
- Temporary solution: don't run in standby mode. Ben.
- gutters on building.
- Steve.
Ground Loops
- Power supplies, racks, optical tables, chambers, LSC PDs, cables etc.
- Get rid of all these long cables to the control room !!
