Size: 9081
Comment:
|
Size: 4554
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 5: | Line 5: |
| We think we're plagued by alignment drifts, and it's hard to tell where it's occuring. We shouldn't wait for wave-front sensors on this one, but maybe instead start thinking about a DC-wavefront sensor system (ie, dithering and demodulating in a front-end). Someone should start working on some RF wave-front sensors, though. --Get the AutoRun GUI working. --LSC code upgrades Clean up the code, add state vectors for the AutoRunGUI, MatrixCopy fix, fast (or slew rate limited) input-matrix ramping, more things --measure all RF phases in various stages of lock, especially full lock. |
Rolf & Alex are working on a new ASC code to do all IFO dither alignment based on Bram and Valera's design. |
| Line 31: | Line 18: |
--Full output matrix diagonalization 5x5? --Start thinking up some other schemes (lower RF frequencies, no-bang locking) --Differential demodulation ? or double demodulation? Now we are using less noisy one of 133 or 199MHz demodulation. Should we use both for double demodulation or just leave them? In any case, we should investigate why SP and AP is less noisy with 133MHz demodudlation and why PO is less noisy with 199MHz demodulation. Suspension dewhitening filters (probably doesn't matter at 4 kHz) * Isn't this already done by David Malling? |
|
| Line 56: | Line 26: |
| - suspension diagonalization & gain optimization for all suspensions: coil balancing, F2P filters, POS<->ANG decoupling. Appropriate filters, bandstop filters on all OSEM and oplev damping loops. Dan. - Commission common mode servo analog path. Osamu. - Mode matching from IMC -> IFO. Osamu. - Develop LSC scheme for full lock, reduce CARM offset to 0, automate, characterize. Osamu, Rob, all. - Noise budget, picking up where Ryan left off. Dan, Monica, with help from Rana & Vuk. - time-domain simulation, extrapolation to AdLIGO. Monica, with help from Hiro & Matt. |
- Noise budget > Download the sites' noise budget via CVS and adapt to 40m based on Osamu/David/Ryan's work. |
| Line 122: | Line 80: |
| - How well is ISS running these days? A measure of RIN is needed; it would be nice if we had SOME continual monitor of performance. Osamu: Wait. - When MZ control signal saturates and falls out of lock, the ISS saturates, and MC falls out of lock. Solution is to toggle MZ servo. There should be an alarm to warn us of impending MZ and ISS saturation. Dan? - Get more light onto ISS PDs with new pickoff beamsplitter. - Commission post-MC ISS PDs? Wait, until it becomes clear that intensity noise is limiting us. - The PSL triped off twice in last 6 months for no apparent reason. Resetting the PSL was poblematical, requiring manual adjustment to PA shutter. Is the procedure at fault? Also, do our MOPA power supply front panel controls work? Osamu and Rich. - Should we get a new TT ISS board? The one we have is a prototype, and it is clear from recent work at LLO that the performance can be improved dramatically with some effort. http://www.ligo.caltech.edu/~abbott/files/T050135-00.pdf Wait, until it becomes clear that intensity noise is limiting us. |
- Work on the PSLwatch script to handle all the PSL servo state logic. |
| Line 146: | Line 82: |
| - Is the MINCO temperature controller servo set correctly? Do we still have temperature fluctuations on the PSL FRC with ~ 20 minute timescale? Need to get the MC RF sideband transmission monitor system working. |
- Modify ISS to make the DAQ signals fit in the ADC (110B has a +/- 2V range) |
| Line 152: | Line 86: |
| - The MC RF sideband transmission monitor system is not working, due to a bad lockin amplifier. Should we buy a new one (many $K's), or design a dedicated board like the PMC servo? Osamu: now seen to be a relatively minor problem. |
|
| Line 158: | Line 88: |
| Does it still make sense to make it work, either for replacing the existing RF signal generators, or as part of a servo to stabilize the MC transmission of RF sidebands? Wait. - Replace MC servo board with newer version? Its on the way. - MC WFS gain and UGF was turned way down (UGF=0.6 Hz). Need to minimize ANG->POS couplings on MC suspensions and then try to get it back up. Dan, Osamu. ** - L7 mixer chip for MZ servo. Osamu: wait. - Add phase-correcting Pockels cell actuator for higher-bandwidth MZ loop? Will proabably be needed for AdLIGO, accd to Kentaro. |
This requires making some RF filters to put in between the stages to reduce the intermodulation peaks. WE should also think about the requirements on the spectral purity of these signals. |
| Line 174: | Line 94: |
| Line 178: | Line 99: |
| Line 181: | Line 103: |
| Line 183: | Line 106: |
| - New LSC RFPDs (4+spare). Install AP166 first. Ben, Osamu. ** - Get fast triggered mech shutters for AP and SP. The EOS on MCR seems to be working well; keep it. Ben. - Commission ASC system servos: - on IPPOS/IPANG or TRX to PZT steering mirrors. - Is it possible to stabilize some useful degrees of freedom using 33 MHz WFSs? Wait, until it becomes clear that angular noise is limiting us. |
|
| Line 195: | Line 109: |
| - We can't run EZCA and/or TDS scripts on the linux operator boxes, only on solaris. Several MEDM problems on linux (PVinfo, snapshot, etc don't work). DTT often loses time synch or crashes altogether on linux. DTT trace colors don't work on linux. Foton doesn't work at all. |
|
| Line 202: | Line 112: |
| Line 204: | Line 115: |
| Line 206: | Line 118: |
| - Finalize design of OMC. Rob, Mike. - Finalize design of DC PDs. Ben, Mike. - Review Mike's parts list. All. - Get final budget, and order parts! AJW, Mike. - update DC detection technical design document. AJW. |
|
| Line 218: | Line 121: |
| - Bypass STACIS on Y arm (done, on ETMX, ITMX). Steve. |
|
| Line 222: | Line 124: |
| Line 225: | Line 128: |
| Line 227: | Line 131: |
| Line 229: | Line 134: |
This is the Phantasmical To Do list for the 40m lab:
--In-lock alignment (This is a big one)
Rolf & Alex are working on a new ASC code to do all IFO dither alignment based on Bram and Valera's design.
--Transfer function characterization
- This follows the item above, and everyone will be interested in the results. We need to characterize the: RSE peak optical spring coupled cavity response all open loop gains/cross coupling of signals frequency noise coupling. Finesse has shown some unexpected transfer functions to places other than the DARM signal; we should investigate these. other CARM transfer functions to non-traditional signal ports
--Ground loop
Power supplies, racks, optical tables, chambers, LSC PDs, cables etc. ** <b>Get rid of all these long cables to the control room !!</b>
Main commissioning tasks (all **) - Noise budget
> Download the sites' noise budget via CVS and adapt to 40m based on Osamu/David/Ryan's work.
_ Controls: - Replace c1losepics/c1iscepics temporary cpu with permanent one - c1susvme2 sometimes loses time synch. - Replace framebuilder RAID array with fiber link to QFS system. - LSC front end cpu starts to creep up towards 61 usec. - QPD Whitening boards: whitening filters aren't switching. - Protect the front end code against NaNs from ezcademod and we need to prevent ezcademod from spitting out NaNs (and find out what causes it to do so in the first place). Rolf, Rob. - vacuum breakdown trigger failed to act at 3.7 mTorr on IOO pzts _OMC pzts have to be protected also -V1 valve interlock still does not exits! - Vacuum EPICS screen: TP on/off logic; TP readout; - Front end code slows down considerably when AWG is running? - LSC rack power is inadequate. Redo the system, add Sorensens? - Coupling between LSC IQDemod boards and whitening boards: - Convert all RFPD DC signals to their LSC PD Interface version, - The new fiber timing system from Sander seems to be working ok. - Still have big 60 Hz problems. - Fast DAQ signals from 1Y2. - Linux framebuilder? - Are all controls drawings (PDFs) up-to-date on Ben & Jay's web sites?
_ PSL: - Work on the PSLwatch script to handle all the PSL servo state logic.
- Modify ISS to make the DAQ signals fit in the ADC (110B has a +/- 2V range)
_ MC, MZ: - How about that RF multiplier circuit?
_ SUS, LSC, ASC:
- OSEM sensor glitches: still have them?
- They were isolated to be originating in ICS100b or the VME crate itself. Due to crate 5V power supply?? Rolf has a fix, used at HEPI?
- OSEM problems diagnosed by checkosem script.
- Why are ETMX and ETMY OSEM monitors different from the rest? Why is there an abnormal sign flip on ETMX side?
- Can't put excitations into SIDE OSEM channels.
- Jay, Rolf?
_ Computers: - We can't print to hp2550 from any of the operator consoles except linux3. - Review the stuff in ALH to see if
_ DC readout (all **):
Other:
- beamline as-built documentation. Update ACad drawings.
- Mike, all.
- cranes - overheating, failures.
- Temporary solution: don't run in standby mode. Ben.
- gutters on building.
- Steve.
- replace leaky valve on roughing pump.
- Steve.
- give CaJAGWR attachment:Kirk_CaJAGWR_281106.ppt .
kirk