Suggestions from last year from the TAC:
* Mode scans
* think about MCL acq. in light of the green locking
[[attachment:Jan10-Slides.pdf]]
January 28th, 2010 <
> 9:30 AM Pacific time <
> Call in instructions:<
> (866) 380 - 5536<
> International: (816) 249 - 4731<
> Code: 6263958709<
>
--------
I. '''Agenda'''
A. Current Status / Recent Work
B. Upgrade Plans
II. '''Recent Status'''
A. Personnel Changes
1. Yoichi Aso: 6/08 - 5/09 (gone to U. Tokyo)
1. Koji Arai: 7/09 - 7/2051
1. Kiwamu Izumi: 10/2009 - 10/2011
1. Rob Ward: 1/2004 - 3/2010 (gone to Paris - APC / Barsuglia)
A. DRFPMI results
III. '''Upgrade'''
A. Purpose of the upgrade
1. AdvLIGO LSC / AdVLIGO testbed (green/CDS)
1. Advanced techniques
A. Current status of the upgrade preparation
1. Optics
* Done: Have the SRM / ITMs (dichroic). PRMs polished - coating waits for arm loss measurement
* Done: optical layout
* Decision made to use 11/55 MHz instead of 9/45 MHz: easier layout
* MMT design (Jenne): histograms, alignment orthogonality
* Optics - Gooch & Housego magic HR
* In progress: ETMs are designed - quote is in process
* To be done: ordering smaller optics: folding mirrors, aux. locking, etc.
1. Mechanics -
* Done: SOSs for new, light test masses
* Done: TT suspensions for PRC/SRC
* ANU tip/tilt: LLO Blades + TAMA/ANU compliant eddy current damping
* To be done: Supplimental parts for TTs, some in-vac mechanics
1. Electronics (RF system)
* Done: Designed the multiple frequency RF system to preserve the phase noise performance of the oscillator
* RF signal distribution (oscillators, splitters, amplifiers, etc.)
* Triple-Resonant EOM (New Focus KTP + resonant circuit)
* Done: Placed the order. Received most of the delivery.
* To be done: Actual modifications of the PDs/Modules
1. CDS -
* Done: Demonstrated the control system of one suspension including the cavity lock.
* Layout diagram
* All ADCs, DACs, BOs, IO Chassis, computers, fibers, in house.
* Adapter boards still being packaged
* To be done: Integration of the system
* Integration of cards-chassis-backplanes-cpus ongoing and tricky.
* Coding for the inter process functions (i.e. LSC, ASC, etc)
1. Green beam injection (unstabilized fiber + green injection from the ends)
A. Upgrade Plans
1. upgrading order and rough schedule
IV. End
--------
[[attachment:CDS-diagram.pdf]] [[attachment:CDS-diagram.graffle]]
09/Oct ALIGO ISC meeting material https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Plan/
10/Jan upgrade status (weekly meeting material) [[http://lhocds.ligo-wa.caltech.edu:8000/40m/Upgrade_09?action=AttachFile&do=get&target=100106_upgrade09.pdf|100106_upgrade09.pdf]]