|
Size: 2391
Comment:
|
Size: 2399
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 8: | Line 8: |
| Call in instructions: [BR] (866) 380 - 5536 [BR] International: (816) 249 - 4731 [BR] Code: 6263958709 [BR] |
Call in instructions: [[BR]] (866) 380 - 5536 [[BR]] International: (816) 249 - 4731 [[BR]] Code: 6263958709 [[BR]] |
Feb 28th, 2013 Meeting of the 40m Technical Advisory Committee
Link to the slides https://dcc.ligo.org
Call in instructions: BR (866) 380 - 5536 BR International: (816) 249 - 4731 BR Code: 6263958709 BR
- Title
- People at the 40m
- 2 Ugrads
- Grads - Jenne + visiting grads (Annalisa, Yuta)
- Manasa, Jamie
- Koji, Rana, Steve
OUT Suresh, Den => LLO, Kiwamu => Graduate => LHO
- IN Manasa
- Outline - Overview
- ALS: Initial testing done / upgrade of tables
- Adaptive noise cancellation progress (MC+2 arms)
- IFO locking (main topic)
- Full locking (Jamie)
- Long lasting issue of PRC/SRC mode instability - It seems solved.
- If there is any real progress for PRFPMI locking (Jamie)
- What was the problem (Jamie)
- What is the current solution (Jamie)
- (Quantitative evaluation)
- Full locking plans for 2013 (Jamie)
- What will be the future permanent solution
- Replacing the mirror?
- Adaptive control?
- Towards full locking
- Investigation of the DRMI sensing matrix
- Investigation of the signal normalization scheme
- Integration of the ALS with LSC
- Investigation of the ALS noise in various configurations (FPMI, PRFPMI, DRFPMI)
- What will be the future permanent solution
================================================================
Backup slides
- Purpose of the 40m
- Similar LSC scheme to aLIGO
11 & 55MHz PM (cf 9/45MHz for aLIGO)
- 3f demodulation
- small asymmetry 3cm (cf 8cm for aLIGO)
- same arm finesse (450, cavity pole differs from aLIGO by x100)
- ALS
- Similar LSC scheme to aLIGO
- ALS
- realized in 2011, published in JOSA A in 2012
- further refined in 2012
- dual arms
- improved electronics (beatbox)
- phase tracker
- ALS Status (Yuta/Koji)
- final result (Yuta's measurements in 2012)
- ALS remaining issues (Yuta)
- integration of ALS and LSC
- FPMI excess noise (Yuta's measurements in 2012)
- End table refurbish (Manasa)
- Purpose:
- Method:
- Status:
- Adaptive cancellation progress (Jenne)
- Simultaneous adaptive seismic cancellation: MC/Xarm/Yarm
- Future?
