Differences between revisions 7 and 8
Revision 7 as of 2011-12-19 22:01:37
Size: 750
Editor: KiwamuIzumi
Comment:
Revision 8 as of 2012-01-03 23:02:39
Size: 774
Editor: localhost
Comment: converted to 1.6 markup
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
 This file attachment:40m.pdf contains some results for the 40m ASC sensing matrix.  This file [[attachment:40m.pdf]] contains some results for the 40m ASC sensing matrix.
Line 16: Line 16:
 * [[Dither_ASC|Dither-based Alignment Sensing and Stabilisation]]
 * [[MC_WFS|MC alignment sensing and control using WFSs]]
 * [[Dither_ASC| Dither-based Alignment Sensing and Stabilisation ]]
 * [[MC_WFS| MC alignment sensing and control using WFSs]]

Project Overview

  • Design and ASC scheme after we design one for AdvLIGO
  • Implement and test the new InGaAs, in-vac, high power, FTC WFS. The 40m WFS need not be

    • in-vac, but they should be packaged as such.
  • Measure spring stuff

Control Models

Results and Discussions

Links

RF_ASC (last edited 2012-01-03 23:02:39 by localhost)