Size: 1625
Comment:
|
Size: 1192
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 5: | Line 5: |
| == Finishing in-vac work == We need to try to get this finished by the END OF THIS WEEK (1/18/2013). |
== PR/DR MI commissioning == |
| Line 8: | Line 7: |
| * Finish TT installation * Recover full alignment * Lock PRC * Extract sensor card, allen key, ants from chamber before closing |
* PRMI locked! * Investigate triggering (trigger on POP110 instead?) * What is the correct normalization? |
| Line 13: | Line 11: |
| == PR/DR MI commissioning == This is primary goal. We need to have this working by the end of the month (1/13). |
* Finish updating IFO configure scripts (Jamie) |
| Line 17: | Line 13: |
| * Lock both arms and optimally align * Center spots on the ITMs * Lock the PRMI * PRMI measurements: |
* OSA modulation depth measurements at: * REFL * AS |
| Line 22: | Line 17: |
| * Good camera images: * REFL * AS * POP - improve this camera. Expand the beam, and adjust the brightness * PR/BS face - get these hooked up |
* Power budget at all available ports, include 1f(22)/2f(110) * PRC gain |
| Line 28: | Line 20: |
| * OSA * REFL * AS |
* Oplev calibration (BS? PRM?) |
| Line 32: | Line 22: |
| * Power budget at all available ports, include 1f(22)/2f(110) * PRC gain |
* Sensing matrix * Cavity length (use new Anamaria method) * Loop gain (make sure loop is stable for measurements) * Noise budget |
| Line 35: | Line 27: |
| * Sensing matrix * Cavity length (use new Anamaria method) * Loop gain (make sure loop is stable for measurements) * Noise budget |
* Full Finesse model. |
| Line 41: | Line 30: |
== Full IFO Locking == Roughly three months. |
|
| Line 49: | Line 34: |
| On best-effort basis, although we'll need to coordinate exactly when we do the end-table swap out. |
* ETMY table must be completed ASAP * What is left to do? |
| Line 52: | Line 37: |
| == Things to prepare for next vent == | * ETMX upgrade needs to be planned/coordinated. |
| Line 54: | Line 39: |
| We have no immediate plan to vent in the near future, but I'm going to be checking on progress of this stuff weekly: |
== FPMI == |
| Line 57: | Line 41: |
| * New TT risers * Black glass beam dumps |
== PRFPMI == == DRFPMI == == Next vent == Will need to vent soon to flip SR2. * SR2 flip * Are all black glass beam dumps installed? Longer term: |
40m work plan
This should be kept up-to-date. This is an overview of our near-term goals. We can link to other TODO lists from here.
PR/DR MI commissioning
- PRMI locked!
- Investigate triggering (trigger on POP110 instead?)
- What is the correct normalization?
- Finish updating IFO configure scripts (Jamie)
- OSA modulation depth measurements at:
- REFL
- AS
- Power budget at all available ports, include 1f(22)/2f(110)
- PRC gain
- Oplev calibration (BS? PRM?)
- Sensing matrix
- Cavity length (use new Anamaria method)
- Loop gain (make sure loop is stable for measurements)
- Noise budget
- Full Finesse model.
- Fix hardware anti-aliasing in LSC (move up cutoff freq to correspond to sample rate)
End table upgrade
- ETMY table must be completed ASAP
- What is left to do?
- ETMX upgrade needs to be planned/coordinated.
FPMI
PRFPMI
DRFPMI
Next vent
Will need to vent soon to flip SR2.
- SR2 flip
- Are all black glass beam dumps installed?
Longer term:
- New OSEM mount screws
- New periscope plate