Differences between revisions 5 and 7 (spanning 2 versions)
Revision 5 as of 2013-01-15 00:06:53
Size: 1625
Comment:
Revision 7 as of 2013-04-03 18:23:37
Size: 1192
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
== Finishing in-vac work ==
We need to try to get this finished by the END OF THIS WEEK (1/18/2013).
== PR/DR MI commissioning ==
Line 8: Line 7:
 * Finish TT installation
 * Recover full alignment
 * Lock PRC
 * Extract sensor card, allen key, ants from chamber before closing
 * PRMI locked!
 * Investigate triggering (trigger on POP110 instead?)
 * What is the correct normalization?
Line 13: Line 11:
== PR/DR MI commissioning ==
This is primary goal. We need to have this working by the end of the
month (1/13).
 * Finish updating IFO configure scripts (Jamie)
Line 17: Line 13:
 * Lock both arms and optimally align
   * Center spots on the ITMs
 * Lock the PRMI
 * PRMI measurements:
 * OSA modulation depth measurements at:
   * REFL
   * AS
Line 22: Line 17:
   * Good camera images:
     * REFL
     * AS
     * POP - improve this camera. Expand the beam, and adjust the brightness
     * PR/BS face - get these hooked up
 * Power budget at all available ports, include 1f(22)/2f(110)
   * PRC gain
Line 28: Line 20:
   * OSA
     * REFL
     * AS
 * Oplev calibration (BS? PRM?)
Line 32: Line 22:
   * Power budget at all available ports, include 1f(22)/2f(110)
     * PRC gain
 * Sensing matrix
 * Cavity length (use new Anamaria method)
 * Loop gain (make sure loop is stable for measurements)
 * Noise budget
Line 35: Line 27:
   * Sensing matrix
   * Cavity length (use new Anamaria method)
   * Loop gain (make sure loop is stable for measurements)
   * Noise budget
 * Full Finesse model.
Line 41: Line 30:

== Full IFO Locking ==

Roughly three months.
Line 49: Line 34:
On best-effort basis, although we'll need to coordinate exactly when we
do the end-table swap out.
 * ETMY table must be completed ASAP
   * What is left to do?
Line 52: Line 37:
== Things to prepare for next vent ==  * ETMX upgrade needs to be planned/coordinated.
Line 54: Line 39:
We have no immediate plan to vent in the near future, but I'm going to
be checking on progress of this stuff weekly:
== FPMI ==
Line 57: Line 41:
 * New TT risers
 * Black glass beam dumps
== PRFPMI ==

== DRFPMI ==

== Next vent ==

Will need to vent soon to flip SR2.

 * SR2 flip
 * Are all black glass beam dumps installed?

Longer term:

40m work plan

This should be kept up-to-date. This is an overview of our near-term goals. We can link to other TODO lists from here.

PR/DR MI commissioning

  • PRMI locked!
  • Investigate triggering (trigger on POP110 instead?)
  • What is the correct normalization?
  • Finish updating IFO configure scripts (Jamie)
  • OSA modulation depth measurements at:
    • REFL
    • AS
  • Power budget at all available ports, include 1f(22)/2f(110)
    • PRC gain
  • Oplev calibration (BS? PRM?)
  • Sensing matrix
  • Cavity length (use new Anamaria method)
  • Loop gain (make sure loop is stable for measurements)
  • Noise budget
  • Full Finesse model.
  • Fix hardware anti-aliasing in LSC (move up cutoff freq to correspond to sample rate)

End table upgrade

Project page.

  • ETMY table must be completed ASAP
    • What is left to do?
  • ETMX upgrade needs to be planned/coordinated.

FPMI

PRFPMI

DRFPMI

Next vent

Will need to vent soon to flip SR2.

  • SR2 flip
  • Are all black glass beam dumps installed?

Longer term:

  • New OSEM mount screws
  • New periscope plate