## page was renamed from Other Plans
 * [[Current_Work]]
 * [[Long_Term_Plans_@_the_40m]]
 * [[Near_Term_Plans_@_the_40m]]
= 40m work plan =

This should be kept up-to-date. This is an overview of our near-term goals. We can link to other TODO lists from here.

== PR/DR MI commissioning ==

 * PRMI locked!
 * Investigate triggering (trigger on POP110 instead?)
 * What is the correct normalization?

 * Finish updating IFO configure scripts (Jamie)

 * OSA modulation depth measurements at:
   * REFL
   * AS

 * Power budget at all available ports, include 1f(22)/2f(110)
   * PRC gain

 * Oplev calibration (BS? PRM?)

 * Sensing matrix
 * Cavity length (use new Anamaria method)
 * Loop gain (make sure loop is stable for measurements)
 * Noise budget

 * Full Finesse model.

 * Fix hardware anti-aliasing in LSC (move up cutoff freq to correspond to sample rate)

== End table upgrade ==

[[endtable_upgrade|Project page]].
 * ETMY table must be completed ASAP
   * What is left to do?

 * ETMX upgrade needs to be planned/coordinated.

== FPMI ==

== PRFPMI ==

== DRFPMI ==

== Next vent ==

Will need to vent soon to flip SR2.

 * SR2 flip
 * Are all black glass beam dumps installed?

Longer term:

 * New OSEM mount screws
 * New periscope plate

40m work plan

This should be kept up-to-date. This is an overview of our near-term goals. We can link to other TODO lists from here.

PR/DR MI commissioning

  • PRMI locked!
  • Investigate triggering (trigger on POP110 instead?)
  • What is the correct normalization?
  • Finish updating IFO configure scripts (Jamie)
  • OSA modulation depth measurements at:
    • REFL
    • AS
  • Power budget at all available ports, include 1f(22)/2f(110)
    • PRC gain
  • Oplev calibration (BS? PRM?)
  • Sensing matrix
  • Cavity length (use new Anamaria method)
  • Loop gain (make sure loop is stable for measurements)
  • Noise budget
  • Full Finesse model.
  • Fix hardware anti-aliasing in LSC (move up cutoff freq to correspond to sample rate)

End table upgrade

Project page.

  • ETMY table must be completed ASAP
    • What is left to do?
  • ETMX upgrade needs to be planned/coordinated.

FPMI

PRFPMI

DRFPMI

Next vent

Will need to vent soon to flip SR2.

  • SR2 flip
  • Are all black glass beam dumps installed?

Longer term:

  • New OSEM mount screws
  • New periscope plate