= 40m work plan =

This should be kept up-to-date. This is an overview of our near-term goals. We can link to other TODO lists from here.

== PRMI commissioning ==

 * PRMI locked!
 * Investigate triggering (trigger on POP110 instead?)
 * What is the correct normalization?
 * Lower Q on Vio2 filters

 * Finish updating IFO configure scripts, medm "restore" (Jamie)

 * OSA modulation depth measurements at:
   * REFL
   * AS

 * Power budget at all available ports, include 1f(22)/2f(110)
   * PRC gain

 * Oplev calibration (BS? PRM?)

 * Sensing matrix
 * Cavity length (use new Anamaria method)
 * Loop gain (make sure loop is stable for measurements)
 * Noise budget

 * Full Finesse model.

 * Fix hardware anti-aliasing in LSC (move up cutoff freq to correspond to sample rate)

== DRMI ==

This and FPMI are the next primary tasks. '''''We will need to vent to flip SR2 first.'''''

 * SRC mirror RoC calculations. What is the long-term solution? (Jamie)

== End table upgrade ==

This is needed before we move on the FPMI commissioning.

 * [[endtable_upgrade|Project page]]

 * ETMY table must be completed ASAP (Manasa)
   * What is left to do?

 * ETMX upgrade needs to be planned/coordinated.

== FPMI ==

We obviously need both end tables fully functional before we get to this.

== PRFPMI ==

== DRFPMI ==

== Next vent ==

Will need to vent soon to flip SR2.

 * SR2 flip
 * Are all black glass beam dumps installed?

Longer term:

 * New OSEM mount screws
 * New periscope plate

40m work plan

This should be kept up-to-date. This is an overview of our near-term goals. We can link to other TODO lists from here.

PRMI commissioning

  • PRMI locked!
  • Investigate triggering (trigger on POP110 instead?)
  • What is the correct normalization?
  • Lower Q on Vio2 filters
  • Finish updating IFO configure scripts, medm "restore" (Jamie)
  • OSA modulation depth measurements at:
    • REFL
    • AS
  • Power budget at all available ports, include 1f(22)/2f(110)
    • PRC gain
  • Oplev calibration (BS? PRM?)
  • Sensing matrix
  • Cavity length (use new Anamaria method)
  • Loop gain (make sure loop is stable for measurements)
  • Noise budget
  • Full Finesse model.
  • Fix hardware anti-aliasing in LSC (move up cutoff freq to correspond to sample rate)

DRMI

This and FPMI are the next primary tasks. We will need to vent to flip SR2 first.

  • SRC mirror RoC calculations. What is the long-term solution? (Jamie)

End table upgrade

This is needed before we move on the FPMI commissioning.

  • Project page

  • ETMY table must be completed ASAP (Manasa)
    • What is left to do?
  • ETMX upgrade needs to be planned/coordinated.

FPMI

We obviously need both end tables fully functional before we get to this.

PRFPMI

DRFPMI

Next vent

Will need to vent soon to flip SR2.

  • SR2 flip
  • Are all black glass beam dumps installed?

Longer term:

  • New OSEM mount screws
  • New periscope plate