Preparations for the power supply stop on 20th Feb, 2010
We took the minimum turn off approach.
- Vacuum Rack (Steve)
- Unix computers
- NPRO
- PSL
- RC ion pump
- PMC/MZ HV
Marconis (33.196116MHz & 29.485MHz)
- Sorensens
- LSC power (8ch)
- VME CPUs
- Oplev lasers