= Preparations for the power supply stop on 20th Feb, 2010 = '''Done''' * '''Turned off the vacuum system:''' Transition from "Vacuum Normal" to "All stop" * '''Turned off c0rga''' * '''Check Oplev/PZT/QPDs''' * '''Turn off the racks and the others''' * ETMY * Vac Rack / ETMY Rack * Table: Oplev Laser (from the wall) / AC tap * PSL area * ITMY SPOB shutter / power supply * PZT powers * 1Y1 HV for the ion pump for RC (5kV) * RF stabilizer (rear switch) x3 * Marconis (33.196116MHz & 29.485MHz) * PSL off buttons from the right to left / rotate the key * 4 HVs for HV circuits * HEPA * OMC/LSC areas * OMC rack (short rack) * Aux Injection NPRO * Power supply for Accelerometers (==> Jenne) * Power supply mechanical shutters (under PSL tables / AP table) * Particle Counter * C1OMC, Video Rack, LSC Rack (Only upper two VME were on) * 4 Piezo Jenas * LSC power (short rack) x8 * ETMX - 2 AC taps under the table & Oplev power * JDSU Oplevs power * Below the AP table * Computer racks * '''Put Mylar cover on the flow benches''' * Turn off Air conditioner (S.P.=70F) / Chiller * Two isolation trans * Lock the fridge with tape and put a sign on not to open it