Preparations for the power supply stop on 20th Feb, 2010
Done
Turned off the vacuum system: Transition from "Vacuum Normal" to "All stop"
Turned off c0rga
Check Oplev/PZT/QPDs
Turn off the racks and the others
- ETMY
- Vac Rack / ETMY Rack
- Table: Oplev Laser (from the wall) / AC tap
- PSL area
- ITMY SPOB shutter / power supply
- PZT powers
- 1Y1 HV for the ion pump for RC (5kV)
- RF stabilizer (rear switch) x3
Marconis (33.196116MHz & 29.485MHz)
- PSL off buttons from the right to left / rotate the key
- 4 HVs for HV circuits
- HEPA
- OMC/LSC areas
- OMC rack (short rack)
- Aux Injection NPRO
Power supply for Accelerometers (==> Jenne)
- Power supply mechanical shutters (under PSL tables / AP table)
- Particle Counter
- C1OMC, Video Rack, LSC Rack (Only upper two VME were on)
- 4 Piezo Jenas
- LSC power (short rack) x8
ETMX - 2 AC taps under the table & Oplev power
- JDSU Oplevs power
- Below the AP table
- Computer racks
- ETMY
Put Mylar cover on the flow benches
- Turn off Air conditioner (S.P.=70F) / Chiller
- Two isolation trans
- Lock the fridge with tape and put a sign on not to open it