Preparations for the power supply stop on 20th Feb, 2010

Done

  • Turned off the vacuum system: Transition from "Vacuum Normal" to "All stop"

  • Turned off c0rga

  • Check Oplev/PZT/QPDs

  • Turn off the racks and the others

    • ETMY
      • Vac Rack / ETMY Rack
      • Table: Oplev Laser (from the wall) / AC tap
    • PSL area
      • ITMY SPOB shutter / power supply
      • PZT powers
      • 1Y1 HV for the ion pump for RC (5kV)
      • RF stabilizer (rear switch) x3
      • Marconis (33.196116MHz & 29.485MHz)

      • PSL off buttons from the right to left / rotate the key
      • 4 HVs for HV circuits
      • HEPA
    • OMC/LSC areas
      • OMC rack (short rack)
      • Aux Injection NPRO
      • Power supply for Accelerometers (==> Jenne)

      • Power supply mechanical shutters (under PSL tables / AP table)
      • Particle Counter
      • C1OMC, Video Rack, LSC Rack (Only upper two VME were on)
      • 4 Piezo Jenas
      • LSC power (short rack) x8
    • ETMX - 2 AC taps under the table & Oplev power

    • JDSU Oplevs power
    • Below the AP table
    • Computer racks
  • Put Mylar cover on the flow benches

  • Turn off Air conditioner (S.P.=70F) / Chiller
  • Two isolation trans
  • Lock the fridge with tape and put a sign on not to open it