Size: 930
Comment:
|
Size: 3752
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 2: | Line 2: |
== Interferometer work == |
|
| Line 38: | Line 40: |
=== Week of 3/15-3/19 === * '''3/15-18 LVC meeting''' http://www.ligo.org/conferences/lv0310/ * '''3/19 aLIGO ISC''' === 4/5 ITMX/ITMY placement === === 4/6 ITMY aligned === === 4/12 ITMX aligned === == Suspension preparation == * '''2/16-26 Small Optics Suspension''' * Wed 17 Feb * '''Gluing test''' * Epoxy test. Try gluing a dumbbell to an optic. Check strength of bond. (It's good) * Thurs 18 Feb * '''ITMX guiderod gluing''' * Place ITMX in guiderod fixture * Epoxy guiderod & standoff to ITMX (Afternoon) * Cure epoxy (overnight) * Fri 19 Feb * '''Magnet-dumbbell gluing''' * Make up matching sets of magnets using gaussmeter (Morning) * Etch magnets and dumbbells using razor blade (Morning) * Epoxy magnets to dumbbells (Morning) * Cure epoxy (overnight) * '''ITMY guiderod gluing''' * Place ITMY in guiderod fixtrue * Epoxy guiderods to ITMY (Afternoon) * Cure epoxy (overnight) * Sat 20 Feb * No Electricity - No work * Sun 21 Feb * Mon 22 Feb * '''ITMX magnet gluing''' * Remove ITMX from guiderod fixture, place in magnet fixture * Epoxy magnets ITMX (Afternoon) * Cure epoxy (overnight) * '''EQ stop preparation''' * Talk to Zach - help him get started on this * Plan for viton cutting (something to help measure / keep the razor straight while cutting) * Cut the Viton * Assemble EQ stops (stick the viton in the screws) * Tues 23 Feb * '''EQ stop preparation''' * Zach finish making EQ stops (at least enough for the ITMs...can finish the rest later in the week) * '''Hanging preparation''' * Balance Optical Table (Morning) * Make HeNe OpLev (Morning) * Ensure OSEM satellite box is ready, PZT buzzer is ready, and all other preparations for hanging optics * '''ITMY magnet gluing''' * Glue magnets to ITMY (Afternoon) * Cure epoxy (overnight) * Tue 2 Mar ('''actual date''') * '''ITMX hanging''' * Hang and balance ITMX. (All Day) * Epoxy wire standoffs in place after balancing * Cure epoxy (overnight) * Tue 11 Mar ('''actual date''') * '''ITMY hanging''' * Hang and balance ITMY. (All Day) * Epoxy wire standoffs in place after balancing * Cure epoxy (overnight) * Mon 22 Mar ('''actual date''') * '''ITMX/ITMY baking''' - done * Remove both ITMs from their suspensions (Morning) 2 person job * Vacuum bake to clean the optics - 48 hours * Leave the 2 ITMs alone in the bake oven * Get RGA scan to confirm they're sparkly clean * Mon 5 Apr ('''actual date''') * '''Final Prep for Installation''' * Reinstall optics in suspensions (Definitely a 2 person job) * Install the OSEMs in the new suspension towers (OSEMs to be taken from current MOS ITMs) |
Interferometer work
Week of 2/16-2/19
2/16-19 Pre-vent works
- Tuning of the MC servo ~ low power MC test
- End X/Y transmon optics relocations ~ making spaces for green
- ITM pointing preparations ~ green/red pointers at the both ends
2/17 40m meeting
2/18 Power shutdown preparation
2/19 No work / only papers and pens
2/20 Power shutdown
Week of 2/22-2/26
2/22 Power shutdown recovery
- System recovery
- Check MC SOS status
Low power MC mode ~ P(intra_cav)<10W at the resonance (~10mW incident)
- Pre-vent check list
- PZT HV / Oplevs / etc
2/23 Reserved for trouble shooting
2/23 or 24 Vent
2/24 40m meeting
2/25 Tank opening
- OMC/IMC access connector
- ITMX/Y heavy door
2/25 Input MC beam adjustment
- beam centering to MC mirrors
Week of 3/15-3/19
3/15-18 LVC meeting http://www.ligo.org/conferences/lv0310/
3/19 aLIGO ISC
4/5 ITMX/ITMY placement
4/6 ITMY aligned
4/12 ITMX aligned
Suspension preparation
2/16-26 Small Optics Suspension
- Wed 17 Feb
Gluing test
- Epoxy test. Try gluing a dumbbell to an optic. Check strength of bond. (It's good)
- Thurs 18 Feb
ITMX guiderod gluing
- Place ITMX in guiderod fixture
Epoxy guiderod & standoff to ITMX (Afternoon)
- Cure epoxy (overnight)
- Fri 19 Feb
Magnet-dumbbell gluing
- Make up matching sets of magnets using gaussmeter (Morning)
- Etch magnets and dumbbells using razor blade (Morning)
- Epoxy magnets to dumbbells (Morning)
- Cure epoxy (overnight)
ITMY guiderod gluing
- Place ITMY in guiderod fixtrue
- Epoxy guiderods to ITMY (Afternoon)
- Cure epoxy (overnight)
- Sat 20 Feb
- No Electricity - No work
- Sun 21 Feb
- Mon 22 Feb
ITMX magnet gluing
- Remove ITMX from guiderod fixture, place in magnet fixture
- Epoxy magnets ITMX (Afternoon)
- Cure epoxy (overnight)
EQ stop preparation
- Talk to Zach - help him get started on this
- Plan for viton cutting (something to help measure / keep the razor straight while cutting)
- Cut the Viton
- Assemble EQ stops (stick the viton in the screws)
- Tues 23 Feb
EQ stop preparation
- Zach finish making EQ stops (at least enough for the ITMs...can finish the rest later in the week)
Hanging preparation
ITMY magnet gluing
- Glue magnets to ITMY (Afternoon)
- Cure epoxy (overnight)
Tue 2 Mar (actual date)
ITMX hanging
- Hang and balance ITMX. (All Day)
- Epoxy wire standoffs in place after balancing
- Cure epoxy (overnight)
Tue 11 Mar (actual date)
ITMY hanging
- Hang and balance ITMY. (All Day)
- Epoxy wire standoffs in place after balancing
- Cure epoxy (overnight)
Mon 22 Mar (actual date)
ITMX/ITMY baking - done
- Remove both ITMs from their suspensions (Morning) 2 person job
- Vacuum bake to clean the optics - 48 hours
- Leave the 2 ITMs alone in the bake oven
- Get RGA scan to confirm they're sparkly clean
Mon 5 Apr (actual date)
Final Prep for Installation
- Reinstall optics in suspensions (Definitely a 2 person job)
- Install the OSEMs in the new suspension towers (OSEMs to be taken from current MOS ITMs)
- Wed 17 Feb