Line 1: Line 1:
Describe Past Plans here. === Week of 2/16-2/19 ===
 * '''2/16-19 Pre-vent works'''
  * Tuning of the MC servo ~ low power MC test
  * End X/Y transmon optics relocations ~ making spaces for green
  * ITM pointing preparations ~ green/red pointers at the both ends

 * '''2/17 40m meeting'''

 * '''2/18 Power shutdown preparation'''

 * '''2/19 No work / only papers and pens'''

 * '''2/20 Power shutdown'''

=== Week of 2/22-2/26 ===
 * '''2/22 Power shutdown recovery'''
  * System recovery

  * Check MC SOS status
   * Low power MC mode ~ P(intra_cav)<10W at the resonance (~10mW incident)
  * Pre-vent check list
   * PZT HV / Oplevs / etc

 * '''2/23 Reserved for trouble shooting'''

 * '''2/23 or 24 Vent'''

 * '''2/24 40m meeting '''

 * '''2/25 Tank opening'''
  * OMC/IMC access connector
  * ITMX/Y heavy door

 * '''2/25 Input MC beam adjustment'''
  * beam centering to MC mirrors

Week of 2/16-2/19

  • 2/16-19 Pre-vent works

    • Tuning of the MC servo ~ low power MC test
    • End X/Y transmon optics relocations ~ making spaces for green
    • ITM pointing preparations ~ green/red pointers at the both ends
  • 2/17 40m meeting

  • 2/18 Power shutdown preparation

  • 2/19 No work / only papers and pens

  • 2/20 Power shutdown

Week of 2/22-2/26

  • 2/22 Power shutdown recovery

    • System recovery
    • Check MC SOS status
      • Low power MC mode ~ P(intra_cav)<10W at the resonance (~10mW incident)

    • Pre-vent check list
      • PZT HV / Oplevs / etc
  • 2/23 Reserved for trouble shooting

  • 2/23 or 24 Vent

  • 2/24 40m meeting

  • 2/25 Tank opening

    • OMC/IMC access connector
    • ITMX/Y heavy door
  • 2/25 Input MC beam adjustment

    • beam centering to MC mirrors