Differences between revisions 6 and 7
Revision 6 as of 2009-12-03 02:30:58
Size: 848
Editor: KojiArai
Comment:
Revision 7 as of 2009-12-03 16:48:33
Size: 1202
Editor: SteveVass
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
  * aux beam as a reference   * aux beam as a reference....align to overlap in vacuum
Line 16: Line 16:
    * update snap shots: sus, strain gauges,IOO, OMC....etc (OMC has no strain gauges)
    * recenter: IP-ANG-POS, oplevs..... at full lock
    * test drive crane drives
    * clean clean-tools again
    * keep eyes on particle counter: abort over 10,000
    * cut some viton tips for spare earthquake stop screws
    

Cleaning of the suspended test mass (Dec 2009)

Motivation

Whether contamination or not

Measurements before the vent

- Visibility measurement

- Finesse measurement

Overview of the plan

  • We plan for the vent from 7th Dec to 11th Dec in 2009.

  • Preparation

    • wiping preparation
    • wiping practice
    • aux beam as a reference....align to overlap in vacuum
    • Input PZT (strain gauge) /HV off/OMC PZT HV
      • update snap shots: sus, strain gauges,IOO, OMC....etc (OMC has no strain gauges)
      • recenter: IP-ANG-POS, oplevs..... at full lock
      • test drive crane drives
      • clean clean-tools again
      • keep eyes on particle counter: abort over 10,000
      • cut some viton tips for spare earthquake stop screws
  • Monday:

    • Vent / Open ETMX if possible
    • Take pictures before touching
    • Record positions of the mirrors (OSEMs/OPLEVs)
  • ~ Wednessday: - IPANG beam - ITMX position (pushing screws) - ITMX BB leveling - measure the distance of the breadboards - check of the optics in the chambers

  • Thursday: - Evacuation

  • Friday:

Detailed plan

Optics_Cleaning (last edited 2012-01-03 23:02:40 by localhost)