Differences between revisions 3 and 8 (spanning 5 versions)
Revision 3 as of 2009-12-03 00:49:36
Size: 706
Editor: KojiArai
Comment:
Revision 8 as of 2009-12-04 20:21:09
Size: 2081
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Cleaning of the suspended test mass =
= Cleaning of the suspended test mass (Dec 2009) =
Line 4: Line 3:
Line 8: Line 6:
=== - Visibility measurement ===
=== - Finesse measurement ===
== Overview of the plan ==
 * '''We plan for the vent from 7th Dec to 11th Dec in 2009. '''
Line 9: Line 11:
== Overview of the plan ==  * '''Preparation '''
  * wiping preparation
  * wiping practice
  * aux beam as a reference....align to overlap in vacuum
  * Input PZT (strain gauge) /HV off/OMC PZT HV
    * update snap shots: sus, strain gauges,IOO, OMC....etc (OMC has no strain gauges)
    * recenter: IP-ANG-POS, oplevs..... at full lock
    * test drive crane drives
    * clean clean-tools again
    * keep eyes on particle counter: abort over 10,000
    * cut some viton tips for spare earthquake stop screws
    
 * '''Monday:'''
  * Vent / Open ETMX if possible
  * Take pictures before touching
  * Record positions of the mirrors (OSEMs/OPLEVs)
Line 11: Line 28:
We plan for the vent from 7th Dec to 11th Dec in 2009.  * '''Tuesday:'''
  * ETMX wipe
  * ETMY wipe
Line 13: Line 32:
- wiping preparation - wiping practice - aux beam as a reference - Input PZT (strain gauge) /HV off/OMC PZT HV  * '''~ Wednessday:'''
  * IPANG beam
  * ITMX position (pushing screws)
  * ITMX BB leveling
  * measure the distance of the breadboards
  * check of the optics in the chambers
  * ITMY wipe
  * ITMX wipe
Line 15: Line 41:
Monday - Vent  * '''Thursday:''' - Evacuation
Line 17: Line 43:
Tuesday-Wednessday - Take pictures before touching - position of the mirrors (OSEMs/OPLEVs)

- Wiping Practice

ETMX ETMY ITMY ITMX (hardest)

- IPANG beam - ITMX position (pushing screws) - ITMX BB leveling - measure the distance of the breadboards - check of the optics in the chambers

Thursday - Evacuation

Friday
 * '''Friday: '''
Line 30: Line 46:

 * '''Friday, 4 Dec: '''
  * Practice cutting viton, so we can get the correct sizes if we need to replace stops. (Jenne)
  * Recenter all of our pointing PDs (oplevs and IP_POS, IP_ANG).
  * Update snapshots of all MEDM screens that have alignment information.
  * Move extraneous equipment around chamber doors: Make sure we have clear access (esp. seismometers need moving)

 * '''Monday: '''
  * Before venting, check that all the recentering done on Friday is still good. If not, redo.
  * Vent
  * During vent, practice drag wiping a spare random optic (maybe a 2" CVI optic?)
  * Open ETMX
  * Take photos of ETMX before touching
  * Close up ETMX with light doors for the night

 * '''Tuesday: '''

 * '''Wednesday: '''

 * '''Thursday: '''

 * '''Friday: '''

Cleaning of the suspended test mass (Dec 2009)

Motivation

Whether contamination or not

Measurements before the vent

- Visibility measurement

- Finesse measurement

Overview of the plan

  • We plan for the vent from 7th Dec to 11th Dec in 2009.

  • Preparation

    • wiping preparation
    • wiping practice
    • aux beam as a reference....align to overlap in vacuum
    • Input PZT (strain gauge) /HV off/OMC PZT HV
      • update snap shots: sus, strain gauges,IOO, OMC....etc (OMC has no strain gauges)
      • recenter: IP-ANG-POS, oplevs..... at full lock
      • test drive crane drives
      • clean clean-tools again
      • keep eyes on particle counter: abort over 10,000
      • cut some viton tips for spare earthquake stop screws
  • Monday:

    • Vent / Open ETMX if possible
    • Take pictures before touching
    • Record positions of the mirrors (OSEMs/OPLEVs)
  • Tuesday:

    • ETMX wipe
    • ETMY wipe
  • ~ Wednessday:

    • IPANG beam
    • ITMX position (pushing screws)
    • ITMX BB leveling
    • measure the distance of the breadboards
    • check of the optics in the chambers
    • ITMY wipe
    • ITMX wipe
  • Thursday: - Evacuation

  • Friday:

Detailed plan

  • Friday, 4 Dec:

    • Practice cutting viton, so we can get the correct sizes if we need to replace stops. (Jenne)
    • Recenter all of our pointing PDs (oplevs and IP_POS, IP_ANG).
    • Update snapshots of all MEDM screens that have alignment information.
    • Move extraneous equipment around chamber doors: Make sure we have clear access (esp. seismometers need moving)
  • Monday:

    • Before venting, check that all the recentering done on Friday is still good. If not, redo.
    • Vent
    • During vent, practice drag wiping a spare random optic (maybe a 2" CVI optic?)
    • Open ETMX
    • Take photos of ETMX before touching
    • Close up ETMX with light doors for the night
  • Tuesday:

  • Wednesday:

  • Thursday:

  • Friday:

Optics_Cleaning (last edited 2012-01-03 23:02:40 by localhost)