= Cleaning of the suspended test mass = = Cleaning of the suspended test mass (Dec 2009) =
== Motivation ==
Whether contamination or not
Line 3: Line 5:
== Motivation == == Measurements before the vent ==
=== - Visibility measurement ===
=== - Finesse measurement ===
== Overview of the plan ==
 * We plan for the vent from 7th Dec to 11th Dec in 2009.
Line 5: Line 11:
Whether contamination or nor.  * Preparation
  * wiping preparation
  * wiping practice
  * aux beam as a reference
  * Input PZT (strain gauge) /HV off/OMC PZT HV
Line 7: Line 17:
== Measurements before the vent ==  * '''Monday:'''
Line 9: Line 19:
== Overview of the plan ==   * Vent / Open ETMX if possible
  * Take pictures before touching
  * Record positions of the mirrors (OSEMs/OPLEVs)
Line 11: Line 23:
We plan for the vent from 7th Dec to 11th Dec in 2009.  * '''~ Wednessday:'''
Line 13: Line 25:
== Detailed plan ==  - IPANG beam
Line 15: Line 27:
- wiping preparation
- wiping practice
- aux beam as a reference
- Input PZT (strain gauge) /HV off/OMC PZT HV
Line 20: Line 28:
Monday
- Vent
 - ITMX position (pushing screws)
Line 23: Line 30:
Tuesday-Wednessday
- Take pictures before touching
- position of the mirrors (OSEMs/OPLEVs)
Line 27: Line 31:
- Wiping
Practice
 - ITMX BB leveling
Line 30: Line 33:
ETMX
ETMY
ITMY
ITMX (hardest)
Line 35: Line 34:
- IPANG beam
- ITMX position (pushing screws)
- ITMX BB leveling
- measure the distance of the breadboards
- check of the optics in the chambers
 - measure the distance of the breadboards
Line 41: Line 36:
Thursday
- Evacuation
Line 44: Line 37:
Friday  - check of the optics in the chambers

 * '''Thursday:''' - Evacuation

 * '''Friday: '''

== Detailed plan ==

Cleaning of the suspended test mass (Dec 2009)

Motivation

Whether contamination or not

Measurements before the vent

- Visibility measurement

- Finesse measurement

Overview of the plan

  • We plan for the vent from 7th Dec to 11th Dec in 2009.
  • Preparation
    • wiping preparation
    • wiping practice
    • aux beam as a reference
    • Input PZT (strain gauge) /HV off/OMC PZT HV
  • Monday:

    • Vent / Open ETMX if possible
    • Take pictures before touching
    • Record positions of the mirrors (OSEMs/OPLEVs)
  • ~ Wednessday: - IPANG beam - ITMX position (pushing screws) - ITMX BB leveling - measure the distance of the breadboards - check of the optics in the chambers

  • Thursday: - Evacuation

  • Friday:

Detailed plan