Differences between revisions 1 and 4 (spanning 3 versions)
Revision 1 as of 2009-12-03 00:47:45
Size: 725
Editor: KojiArai
Comment:
Revision 4 as of 2009-12-03 00:50:00
Size: 709
Editor: KojiArai
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Cleaning of the suspended test mass = = Cleaning of the suspended test mass (Dec 2009) =
== Motivation ==
Whether contamination or not
Line 3: Line 5:
== Motivation ==

Whether contamination or nor.

== Measurements before the vent ==  
== Overview of the plan ==  
== Measurements before the vent ==
== Overview of the plan ==
Line 13: Line 9:
== Detailed plan == - wiping preparation - wiping practice - aux beam as a reference - Input PZT (strain gauge) /HV off/OMC PZT HV
Line 15: Line 11:
- wiping preparation
- wiping practice
- aux beam as a reference
- Input PZT (strain gauge) /HV off/OMC PZT HV
Monday - Vent
Line 20: Line 13:
Monday
- Vent
Tuesday-Wednessday - Take pictures before touching - position of the mirrors (OSEMs/OPLEVs)
Line 23: Line 15:
Tuesday-Wednessday
- Take pictures before touching
- position of the mirrors (OSEMs/OPLEVs)
- Wiping Practice
Line 27: Line 17:
- Wiping
Practice
ETMX ETMY ITMY ITMX (hardest)
Line 30: Line 19:
ETMX
ETMY
ITMY
ITMX (hardest)
- IPANG beam - ITMX position (pushing screws) - ITMX BB leveling - measure the distance of the breadboards - check of the optics in the chambers
Line 35: Line 21:
- IPANG beam
- ITMX position (pushing screws)
- ITMX BB leveling
- measure the distance of the breadboards
- check of the optics in the chambers

Thursday
- Evacuation
Thursday - Evacuation
Line 45: Line 24:

== Detailed plan ==

Cleaning of the suspended test mass (Dec 2009)

Motivation

Whether contamination or not

Measurements before the vent

Overview of the plan

We plan for the vent from 7th Dec to 11th Dec in 2009.

- wiping preparation - wiping practice - aux beam as a reference - Input PZT (strain gauge) /HV off/OMC PZT HV

Monday - Vent

Tuesday-Wednessday - Take pictures before touching - position of the mirrors (OSEMs/OPLEVs)

- Wiping Practice

ETMX ETMY ITMY ITMX (hardest)

- IPANG beam - ITMX position (pushing screws) - ITMX BB leveling - measure the distance of the breadboards - check of the optics in the chambers

Thursday - Evacuation

Friday

Detailed plan

Optics_Cleaning (last edited 2012-01-03 23:02:40 by localhost)