Line 5: Line 5:
Whether contamination or nor. Whether contamination or not
Line 7: Line 7:
== Measurements before the vent ==  == Measurements before the vent ==
Line 9: Line 9:
== Overview of the plan ==  == Overview of the plan ==
Line 13: Line 13:
== Detailed plan == - wiping preparation - wiping practice - aux beam as a reference - Input PZT (strain gauge) /HV off/OMC PZT HV
Line 15: Line 15:
- wiping preparation
- wiping practice
- aux beam as a reference
- Input PZT (strain gauge) /HV off/OMC PZT HV
Monday - Vent
Line 20: Line 17:
Monday
- Vent
Tuesday-Wednessday - Take pictures before touching - position of the mirrors (OSEMs/OPLEVs)
Line 23: Line 19:
Tuesday-Wednessday
- Take pictures before touching
- position of the mirrors (OSEMs/OPLEVs)
- Wiping Practice
Line 27: Line 21:
- Wiping
Practice
ETMX ETMY ITMY ITMX (hardest)
Line 30: Line 23:
ETMX
ETMY
ITMY
ITMX (hardest)
- IPANG beam - ITMX position (pushing screws) - ITMX BB leveling - measure the distance of the breadboards - check of the optics in the chambers
Line 35: Line 25:
- IPANG beam
- ITMX position (pushing screws)
- ITMX BB leveling
- measure the distance of the breadboards
- check of the optics in the chambers

Thursday
- Evacuation
Thursday - Evacuation
Line 45: Line 28:

== Detailed plan ==

Cleaning of the suspended test mass

Motivation

Whether contamination or not

Measurements before the vent

Overview of the plan

We plan for the vent from 7th Dec to 11th Dec in 2009.

- wiping preparation - wiping practice - aux beam as a reference - Input PZT (strain gauge) /HV off/OMC PZT HV

Monday - Vent

Tuesday-Wednessday - Take pictures before touching - position of the mirrors (OSEMs/OPLEVs)

- Wiping Practice

ETMX ETMY ITMY ITMX (hardest)

- IPANG beam - ITMX position (pushing screws) - ITMX BB leveling - measure the distance of the breadboards - check of the optics in the chambers

Thursday - Evacuation

Friday

Detailed plan