= Cleaning of the suspended test mass = = Cleaning of the suspended test mass (Dec 2009) =
== Motivation ==
The round trip loss in the 40m cavity is estimated to be around 170ppm. We are going to confirm whether this comes from the hydrocarbon contamination and wiping of the mirror by acetone and isopropyl may result in improvement of the optical loss, or not.
Line 3: Line 5:
== Motivation == In addition we can evaluate the use of those solvents. If we observe the degradation of the loss or the finesse, we will forbid them.
Line 5: Line 7:
Whether contamination or nor. == Measurements before the cleaning ==
=== - Visibility measurement ===
Most recent arm visibility measurement has been done on Oct 07, 2009. [http://nodus.ligo.caltech.edu:8080/40m/2070 corresponding elog entry]
Line 7: Line 11:
== Measurements before the vent == {{{
Measured arm reflectivity R_cav:
X arm: 0.875 +/- 0.005
Y arm: 0.869 +/- 0.006
}}}
Line 9: Line 17:
== Overview of the plan == === - Cavity pole measurement ===
Most recent arm visibility measurement has been done on Nov 10, 2009. [http://nodus.ligo.caltech.edu:8080/40m/2226 corresponding elog entry]
Line 11: Line 20:
We plan for the vent from 7th Dec to 11th Dec in 2009. {{{
Measured arm cavity pole frequency f_pole [Hz]:
X arm: 1720 +/- 70
Y arm: 1650 +/- 70
}}}
Line 13: Line 26:
== Detailed plan == === - Estimated finesse and arm loss ===
Line 15: Line 28:
- wiping preparation
- wiping practice
- aux beam as a reference
- Input PZT (strain gauge) /HV off/OMC PZT HV
== Measurements after the cleaning ==
=== - Visibility measurement ===
=== - Cavity pole measurement ===
=== - Estimated finesse ===
-------
== Overview of the plan ==
 * '''We plan for the vent from 7th Dec to 11th Dec in 2009. '''
Line 20: Line 36:
Monday
- Vent
 * '''Preparation '''
  * Wiping Preparation
  * Vent Preparation
Line 23: Line 40:
Tuesday-Wednessday
- Take pictures before touching
- position of the mirrors (OSEMs/OPLEVs)
 * '''Monday:'''
  * Pre-vent check 8:00~
  * Vent from 9:30~
  * Stop venting ~14:00
  * Check OSEM/Oplev values
  * Wipe ETMX 14:00~
   * Open ETMX 14:00~15:00
   * Mirror wiping 15:00~16:00
   * Check alignment / Close up 16:00~17:00
Line 27: Line 50:
- Wiping
Practice
 * '''Tuesday:'''
  * (ETMX wipe)
  * ETMY wipe
  * ITMY wipe
  * Check of the optics in the chambers (ITMY)
Line 30: Line 56:
ETMX
ETMY
ITMY
ITMX (hardest)
 * '''~ Wednessday:'''
  * ITMX wipe
   * Record ITMX position (pushing screws)
   * ITMX BB leveling
   * measure the distance of the breadboards
  * 40m meeting
  * Check of the optics in the chambers (ITMX/BS)
Line 35: Line 64:
- IPANG beam
- ITMX position (pushing screws)
- ITMX BB leveling
- measure the distance of the breadboards
- check of the optics in the chambers
 * '''Thursday:'''
  * Evacuation
Line 41: Line 67:
Thursday
- Evacuation
 * '''Friday:'''
  * Reserve
Line 44: Line 70:
Friday == Detailed plan ==
 * '''~Friday, 4 Dec: '''
  * Wiping preparation
   * Chemicals:
    * Small bottles (like 250ml) / 3 bottles each (no matter how the size is)
    * '''Acetone''' Spectral Grade, dehydrated (if possible)
    * '''Isopropyl alcohol''' Spectral Grade, dehydrated (if possible)
   * glass sylinges with metal needles, 50ul, at least three sets
   * mirror wiping paper, usual lens paper from Kodak or whatever
   * tools (well cleaned)
   * clamps to mark the position of ITMX: 3pcs
   * halogen light or whatever: light during the work

 * '''Vent Preparation '''
  * Clean clean-tools again
  * Alignment
   * Recenter: IPANG/POS, oplevs with the mirrors fully aligned '''[DONE]'''
   * Align the aux beam as a reference '''[DONE]'''
   * Update snapshots of all MEDM screens for OSEMs/OPLEVs/QPDs/PZT&strain gauges '''[DONE]'''
  * Move extraneous equipment around chamber doors: Make sure we have clear access (esp. seismometers need moving) '''[DONE]'''

 * '''Monday: '''
  * Before venting, check that all the recentering done on Friday is still good. If not, redo. '''[DONE]'''
  * Turn off all OPLEV damping '''[DONE]'''
  * Turn off all HV in vacuum (Input/Output PZT)

  * '''Vent'''

  * During the vent - Door opening preparation
   * Test drive crane drives
   * Move and store abs. length setup to a safe place '''[DONE]'''
   * Practice drag wiping a spare random optic (with an arbitrary 2" CVI optic)
   * Practice cutting viton, so we can get the correct sizes if we need to replace stops. (Jenne)
   * Cut some viton tips for spare earthquake stop screws

  * Environment
   * Keep eyes on particle counter: abort over 10,000
   * Look that we have good RGA scan

  * Open ETMX
   * Take photos of ETMX before touching

  * '''ETMX wipe'''

  * Close up ETMX with light doors for the night

 * '''Tuesday: '''

 * '''Wednesday: '''

 * '''Thursday: '''

 * '''Friday: '''

Cleaning of the suspended test mass (Dec 2009)

Motivation

The round trip loss in the 40m cavity is estimated to be around 170ppm. We are going to confirm whether this comes from the hydrocarbon contamination and wiping of the mirror by acetone and isopropyl may result in improvement of the optical loss, or not.

In addition we can evaluate the use of those solvents. If we observe the degradation of the loss or the finesse, we will forbid them.

Measurements before the cleaning

- Visibility measurement

Most recent arm visibility measurement has been done on Oct 07, 2009. [http://nodus.ligo.caltech.edu:8080/40m/2070 corresponding elog entry]

Measured arm reflectivity R_cav:
X arm: 0.875 +/- 0.005
Y arm: 0.869 +/- 0.006

- Cavity pole measurement

Most recent arm visibility measurement has been done on Nov 10, 2009. [http://nodus.ligo.caltech.edu:8080/40m/2226 corresponding elog entry]

Measured arm cavity pole frequency f_pole [Hz]:
X arm: 1720 +/- 70
Y arm: 1650 +/- 70

- Estimated finesse and arm loss

Measurements after the cleaning

- Visibility measurement

- Cavity pole measurement

- Estimated finesse


Overview of the plan

  • We plan for the vent from 7th Dec to 11th Dec in 2009.

  • Preparation

    • Wiping Preparation
    • Vent Preparation
  • Monday:

    • Pre-vent check 8:00~
    • Vent from 9:30~
    • Stop venting ~14:00
    • Check OSEM/Oplev values
    • Wipe ETMX 14:00~
      • Open ETMX 14:00~15:00
      • Mirror wiping 15:00~16:00
      • Check alignment / Close up 16:00~17:00
  • Tuesday:

    • (ETMX wipe)
    • ETMY wipe
    • ITMY wipe
    • Check of the optics in the chambers (ITMY)
  • ~ Wednessday:

    • ITMX wipe
      • Record ITMX position (pushing screws)
      • ITMX BB leveling
      • measure the distance of the breadboards
    • 40m meeting
    • Check of the optics in the chambers (ITMX/BS)
  • Thursday:

    • Evacuation
  • Friday:

    • Reserve

Detailed plan

  • ~Friday, 4 Dec:

    • Wiping preparation
      • Chemicals:
        • Small bottles (like 250ml) / 3 bottles each (no matter how the size is)
        • Acetone Spectral Grade, dehydrated (if possible)

        • Isopropyl alcohol Spectral Grade, dehydrated (if possible)

      • glass sylinges with metal needles, 50ul, at least three sets
      • mirror wiping paper, usual lens paper from Kodak or whatever
      • tools (well cleaned)
      • clamps to mark the position of ITMX: 3pcs
      • halogen light or whatever: light during the work
  • Vent Preparation

    • Clean clean-tools again
    • Alignment
      • Recenter: IPANG/POS, oplevs with the mirrors fully aligned [DONE]

      • Align the aux beam as a reference [DONE]

      • Update snapshots of all MEDM screens for OSEMs/OPLEVs/QPDs/PZT&strain gauges [DONE]

    • Move extraneous equipment around chamber doors: Make sure we have clear access (esp. seismometers need moving) [DONE]

  • Monday:

    • Before venting, check that all the recentering done on Friday is still good. If not, redo. [DONE]

    • Turn off all OPLEV damping [DONE]

    • Turn off all HV in vacuum (Input/Output PZT)
    • Vent

    • During the vent - Door opening preparation
      • Test drive crane drives
      • Move and store abs. length setup to a safe place [DONE]

      • Practice drag wiping a spare random optic (with an arbitrary 2" CVI optic)
      • Practice cutting viton, so we can get the correct sizes if we need to replace stops. (Jenne)
      • Cut some viton tips for spare earthquake stop screws
    • Environment
      • Keep eyes on particle counter: abort over 10,000
      • Look that we have good RGA scan
    • Open ETMX
      • Take photos of ETMX before touching
    • ETMX wipe

    • Close up ETMX with light doors for the night
  • Tuesday:

  • Wednesday:

  • Thursday:

  • Friday: