Differences between revisions 4 and 35 (spanning 31 versions)
Revision 4 as of 2009-02-06 22:18:30
Size: 866
Editor: SteveVass
Comment:
Revision 35 as of 2011-07-07 22:37:23
Size: 1622
Editor: SteveVass
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
----
 /!\ '''Edit conflict - other version:'''
= LASER INVENTORY =
        2011 July 7 SV
Line 4: Line 4:
----
----
 /!\ '''Edit conflict - your version:'''
1, Lightwave M126-1064-700 sn415, operating 1.8A 400mW of 1064 nm and 4mW of 532nm
             Location: ETMY_ISCT at east end,
             Shutter: manual only on NPRO
             Interlocked: to local emergency shut off switch
             SOP: [attachment:Approved%201WNPRO-SOP-v4.pdf SOP]
Line 8: Line 10:
----
 [ attachment:opencov ]
2, CrystaLaser 1064nmS of 100mW #81132 at bench MC2: NOT IN USE
Line 11: Line 12:
attachment:opencov2 3, CrystaLaser 1064nm of 180mW # -1274 flq at bench MC2: NOT IN USE
Line 13: Line 14:
attachment:PA%23102 4, RF-PD Jenne's-tester 1064nm of 1.2mW @20mA at SP table
Line 15: Line 16:
Lightwave MOPA, PA#102 at 60,755hrs, output: ~5W, NPRO#206
40M Laser Inventory at Feb 05, 2009
5, Lumix 800-1100nm of 500mW -head only- at cabinet E7

6, JDS-Uniphase 633nmP of 4mW oplev sus laser at 5 places,

7, Innolight- Mephisto: M2000NE, sn 1907, 1064 nm of 2W,from LLO at 2-1-2010,

 . location: PSL enclosure, 25C 2A 2W #2822 MANUAL: attachment:mephisto2wA.pdf attachment:mephisto2wB.pdf

 . Interlocked to IFO main laser emergency shut off switch & PSL output 1.4W mech-shutter

 . [attachment:Approved%2040mLab%202W%20NPRO.pdf SOP]

8, Innolight- Mephisto: model 1000, sn 1634, 1064 nm of 1W at 2A,

 . location:SE-table 1W/200mw--3mW of 532nm

 . Interlocked to local laser emergency shut off switch

 . http://www.innolight.de/docs/mephisto.html http://www.innolight.de/docs/mephisto_q.html

 . [attachment:Approved%201WNPRO-SOP-v4.pdf SOP]
Line 19: Line 39:
1, Lightwave PA#102 @ 77,910 hrs 1064nm of 2.8W @ 27.65A
                   NPRO#206 @ 2.4A at PSL enclosure
9, Innolight- Mephisto:800NE, 837mW 2.1A was at May 2001, old-low quality today
Line 22: Line 41:
 . location: SP-table
Line 23: Line 43:
2, Lightwave 1064nm of 700mW #415 at AP table  . Interlocked: yes
Line 25: Line 45:
 . [attachment:Approved%20Phase_camera_NPRO-SOP-v2.pdf SOP]
Line 26: Line 47:
3, CrystaLaser 1064nmS of 100mW #81132 at east arm cabinet


4, CrystaLaser 1064nm of 180mW # -1274 flq at scattering setup


5, RF-PD tester 1064nm of 1.2mW @20mA at SP table


6, Lumix 800-1100nm of 500mW at east arm cabinet


7, JDS-Uniphase 633nmP of 4mW oplev sus laser at 5 places,
    plus four spares in east arm cabinet
----
 /!\ '''End of edit conflict'''

----
10, JDSU: M126N-1064-700 sn5519, SPARE, control room 102
                                 

LASER INVENTORY

  • 2011 July 7 SV

1, Lightwave M126-1064-700 sn415, operating 1.8A 400mW of 1064 nm and 4mW of 532nm

  • Location: ETMY_ISCT at east end, Shutter: manual only on NPRO Interlocked: to local emergency shut off switch SOP: [attachment:Approved%201WNPRO-SOP-v4.pdf SOP]

2, CrystaLaser 1064nmS of 100mW #81132 at bench MC2: NOT IN USE

3, CrystaLaser 1064nm of 180mW # -1274 flq at bench MC2: NOT IN USE

4, RF-PD Jenne's-tester 1064nm of 1.2mW @20mA at SP table

5, Lumix 800-1100nm of 500mW -head only- at cabinet E7

6, JDS-Uniphase 633nmP of 4mW oplev sus laser at 5 places,

7, Innolight- Mephisto: M2000NE, sn 1907, 1064 nm of 2W,from LLO at 2-1-2010,

  • location: PSL enclosure, 25C 2A 2W #2822 MANUAL: attachment:mephisto2wA.pdf attachment:mephisto2wB.pdf
  • Interlocked to IFO main laser emergency shut off switch & PSL output 1.4W mech-shutter

  • [attachment:Approved%2040mLab%202W%20NPRO.pdf SOP]

8, Innolight- Mephisto: model 1000, sn 1634, 1064 nm of 1W at 2A,

9, Innolight- Mephisto:800NE, 837mW 2.1A was at May 2001, old-low quality today

  • location: SP-table
  • Interlocked: yes
  • [attachment:Approved%20Phase_camera_NPRO-SOP-v2.pdf SOP]

10, JDSU: M126N-1064-700 sn5519, SPARE, control room 102

Laser_Inventory (last edited 2018-12-13 19:30:08 by GautamvenugopalanATligoDOTorg)