= Interferometer Characterization =
== Goals and Motivations ==
= Interferometer Characterization at the 40m prototype =
== Goals ==
 . ''''' To help the DRMI commissioning that will be performed at LLO.'''''
== Motivations ==
 . In the aLIGO schedule ''''' a DRMI test will start on May 2011 at LLO. ''''' Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and hence allow to finish the commissioning in shorter time. Moreover any commissioning tests that will be performed at LLO should be well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues.
 . So for this purpose some recipes must be prepared by the 40m lab. Each recipe includes descriptions about how to make a commissioning test, how to estimate important parameters and the results at the 40m. Additionally some useful scripts must be developed at the 40m.
Line 4: Line 8:
[[BR]]
Line 11: Line 14:
= Characterization Plan at the 40m =
== Schnupp asymmetry ==
= DRMI Characterization Plan at the 40m =
== Schnupp asymmetry measurement ==
Line 16: Line 19:
[[BR]] [[BR]][[BR]]
Line 18: Line 21:
== Cavity length == == Cavity length measurements ==
Line 22: Line 25:
[[BR]] [[BR]][[BR]]
Line 24: Line 27:
== Recycling gains == == Recycling gain measurements ==
Line 27: Line 30:
[[BR]] [[BR]][[BR]]
Line 29: Line 32:
== Sensing matrix ==
== Reflectivity check ==
Line 32: Line 36:
[[BR]] [[BR]][[BR]]
Line 34: Line 38:
== Actuator responses ==
== Sensing matrix check ==
Line 37: Line 42:
[[BR]] [[BR]][[BR]]

== Calibration of Actuator responses ==
=== How to ===
=== Results ===
[[BR]][[BR]]
Line 43: Line 53:
[[BR]][[BR]]

== IFO modeling ==
=== How to ===
=== Results ===
[[BR]][[BR]]

== Estimation of Suspensions' Position ==
=== Requirements ===
=== How to ===
=== Results ===
[[BR]][[BR]]

== Locking procedure ==
=== How to ===
[[BR]][[BR]]

== MICH actuator decoupling ==
=== Requirements ===
=== How to ===

Interferometer Characterization at the 40m prototype

Goals

  • To help the DRMI commissioning that will be performed at LLO.

Motivations

  • In the aLIGO schedule a DRMI test will start on May 2011 at LLO. Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and hence allow to finish the commissioning in shorter time. Moreover any commissioning tests that will be performed at LLO should be well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues.

  • So for this purpose some recipes must be prepared by the 40m lab. Each recipe includes descriptions about how to make a commissioning test, how to estimate important parameters and the results at the 40m. Additionally some useful scripts must be developed at the 40m.

BR BR


BR

DRMI Characterization Plan at the 40m

Schnupp asymmetry measurement

Requirement

How to

Results

BRBR

Cavity length measurements

Requirements

How to

Results

BRBR

Recycling gain measurements

How to

Results

BRBR

Reflectivity check

How to

Results

BRBR

Sensing matrix check

How to

Results

BRBR

Calibration of Actuator responses

How to

Results

BRBR

f2a filter adjustment

Requirement

How to

Results

BRBR

IFO modeling

How to

Results

BRBR

Estimation of Suspensions' Position

Requirements

How to

Results

BRBR

Locking procedure

How to

BRBR

MICH actuator decoupling

Requirements

How to

Interferometer_Characterization (last edited 2012-03-11 03:31:49 by KiwamuizumiATligoDOTorg)