Differences between revisions 25 and 30 (spanning 5 versions)
Revision 25 as of 2011-06-06 21:44:09
Size: 2109
Editor: KiwamuIzumi
Comment:
Revision 30 as of 2011-06-07 20:46:48
Size: 3491
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
[[BR]]
Line 13: Line 14:
[[BR]] <<Anchor(plantop)>>  <<Anchor(plantop)>>
Line 15: Line 16:
== Schnupp asymmetry measurement == == Schnupp asymmetry measurement and its adjustment ==
Line 17: Line 18:
  . {{{
 Schnupp asymmetry = 0.0342 [m] +/- XXX [mm]
}}}
 . The Schnupp asymmetry determines the reflectivity '' r ''and transmissivity '' t '' of the Michelson for the f1 and f2 sidebands when the carrier is kept in the dark condition. In the design the f2 sideband should be critical coupling for the dual recycling cavity. To achieve the critical coupling we should adjust '' r '' and '' t'' properly.

 . According to a simulation the asymmetry should be within the precision of XXX mm to achieve more than 95 % of the power build up.
Line 18: Line 26:
 . Here is an instruction how to measure the Schnupp asymmetry.
Line 19: Line 28:
 . The result at the 40m was ... and the precision was +/- XXX mm. This implies us to fix the length of the asymmetry.

Line 21: Line 33:
== PRC length measurement ==
== PRC length measurement and its adjustment ==
Line 23: Line 36:
 . {{{ lprc = 6.7538 [m] +/- XXX [mm]
}}}
 . In order to resonate both f1 and f2 sidebands the length should be adjusted to ..

 . In addition to that the arm makes the non-zero phase shift on these sidebands and makes the ..
Line 24: Line 43:
 . To measure the length of the recycling cavity,
Line 25: Line 46:
 .
Line 29: Line 51:
 . {{{ lsrc = 5.39915 [m] +/- XXX mm
 }}}
Line 30: Line 54:
 .
Line 31: Line 56:
 .
Line 35: Line 61:
 . Since the recycling gain is related to loss in the recycling cavity,...
Line 36: Line 63:
 .
Line 37: Line 65:
 . {{{
 Carrirer = XX
 f1 sideband = YY
 f2 sideband = ZZ
}}}
Line 39: Line 72:
== Beam spot position on BS ==
=== Requirements ===
{{{ off-centering < XXX mm
}}}
 . To get a clean AS signal

=== How to ===
=== results ===

Interferometer Characterization at the 40m prototype

Goals

  • To help the DRMI commissioning that will be performed at LLO.

Motivations

  • In the aLIGO schedule a DRMI test will start on May 2011 at LLO. Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and hence allow to finish the commissioning in the shortest time. Moreover any commissioning tests that will be performed at LLO should be well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues.

  • So for this purpose some recipes must be prepared by the 40m lab. Each recipe includes descriptions about how to make a commissioning test, how to estimate important parameters and the results at the 40m. Additionally some useful scripts must be developed at the 40m.

BR BR

BR


DRMI Characterization Plan at the 40m

Schnupp asymmetry measurement and its adjustment

Requirement

  •  Schnupp asymmetry = 0.0342 [m] +/- XXX [mm]
  • The Schnupp asymmetry determines the reflectivity r and transmissivity t of the Michelson for the f1 and f2 sidebands when the carrier is kept in the dark condition. In the design the f2 sideband should be critical coupling for the dual recycling cavity. To achieve the critical coupling we should adjust r and t properly.

  • According to a simulation the asymmetry should be within the precision of XXX mm to achieve more than 95 % of the power build up.

How to

  • Here is an instruction how to measure the Schnupp asymmetry.

Results

  • The result at the 40m was ... and the precision was +/- XXX mm. This implies us to fix the length of the asymmetry.

BRBR

PRC length measurement and its adjustment

Requirements

  • {{{ lprc = 6.7538 [m] +/- XXX [mm]

}}}

  • In order to resonate both f1 and f2 sidebands the length should be adjusted to ..
  • In addition to that the arm makes the non-zero phase shift on these sidebands and makes the ..

How to

  • To measure the length of the recycling cavity,

Results

BRBR

SRC length measurement

Requirements

  • {{{ lsrc = 5.39915 [m] +/- XXX mm }}}

How to

Results

BRBR

Recycling gain measurements

  • Since the recycling gain is related to loss in the recycling cavity,...

How to

Results

  •  Carrirer    = XX
     f1 sideband = YY
     f2 sideband = ZZ

BRBR

Beam spot position on BS

Requirements

{{{ off-centering < XXX mm }}}

  • To get a clean AS signal

How to

results

Reflectivity check

How to

Results

BRBR

Sensing matrix check

How to

Results

BRBR

Calibration of Actuator responses

How to

Results

BRBR

f2a filter adjustment

Requirement

How to

Results

BRBR

IFO modeling

How to

Results

BRBR

Estimation of Suspensions' Position

Requirements

How to

Results

BRBR

Locking procedure

How to

BRBR

MICH actuator decoupling

Requirements

How to

BR BR

[#plantop back to top]