| . In the aLIGO schedule ''''' a DRMI test will start on May 2011 at LLO. ''''' Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and hence allow to finish the commissioning in shorter time. Moreover any commissioning tests that will be performed at LLO should be well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues. | . In the aLIGO schedule ''''' a DRMI test will start on May 2011 at LLO. ''''' Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and hence allow to finish the commissioning in the shortest time. Moreover any commissioning tests that will be performed at LLO should be well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues. |
| Line 13: | Line 13: |
| [[BR]] | [[BR]] <<Anchor(plantop)>> |
| Line 73: | Line 73: |
| [[BR]] [[BR]] [#plantop back to top] |
Interferometer Characterization at the 40m prototype
Goals
To help the DRMI commissioning that will be performed at LLO.
Motivations
In the aLIGO schedule a DRMI test will start on May 2011 at LLO. Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and hence allow to finish the commissioning in the shortest time. Moreover any commissioning tests that will be performed at LLO should be well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues.
- So for this purpose some recipes must be prepared by the 40m lab. Each recipe includes descriptions about how to make a commissioning test, how to estimate important parameters and the results at the 40m. Additionally some useful scripts must be developed at the 40m.
Contents
- Interferometer Characterization at the 40m prototype
- DRMI Characterization Plan at the 40m
DRMI Characterization Plan at the 40m
Schnupp asymmetry measurement
Requirement
How to
Results
Cavity length measurements
Requirements
How to
Results
Recycling gain measurements
How to
Results
Reflectivity check
How to
Results
Sensing matrix check
How to
Results
Calibration of Actuator responses
How to
Results
f2a filter adjustment
Requirement
How to
Results
IFO modeling
How to
Results
Estimation of Suspensions' Position
Requirements
How to
Results
Locking procedure
How to
MICH actuator decoupling
Requirements
How to