Differences between revisions 2 and 8 (spanning 6 versions)
Revision 2 as of 2011-06-06 20:52:28
Size: 468
Editor: KiwamuIzumi
Comment:
Revision 8 as of 2011-06-06 21:14:43
Size: 1348
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
== Goals and Motivations == == Goals ==
 . ''''' The goal is to help the DRMI commissioning which will be performed at LLO.'''''
== Motivations ==
 . In the aLIGO schedule ''''' a DRMI test will start on May 2011 at LLO. ''''' Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and painless. Moreover any commissioning test that will be performed at LLO should have been well predicted and tested at the 40m so that the people at the site can easily pass the commissioning and possibly spend some time for trouble shooting unexpected issues.
Line 11: Line 14:
= Characterization Plan at the 40m = = DRMI Characterization Plan at the 40m =
Line 13: Line 16:
=== Requirement ===
Line 18: Line 22:
=== Requirements ===
Line 26: Line 31:


== Reflectivity check ==
=== How to ===
=== Results ===
[[BR]]
Line 36: Line 48:

== f2a filter adjustment ==
=== Requirement ===
=== How to ===
=== Results ===

[[BR]]
== IFO modeling ==
=== How to ===
=== Results ===

[[BR]]
== Suspension Positioning ==
=== Requirements ===
=== How to ===
=== Results ===

[[BR]]

Interferometer Characterization

Goals

  • The goal is to help the DRMI commissioning which will be performed at LLO.

Motivations

  • In the aLIGO schedule a DRMI test will start on May 2011 at LLO. Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and painless. Moreover any commissioning test that will be performed at LLO should have been well predicted and tested at the 40m so that the people at the site can easily pass the commissioning and possibly spend some time for trouble shooting unexpected issues.

BR BR BR


BR

DRMI Characterization Plan at the 40m

Schnupp asymmetry

Requirement

How to

Results

BR

Cavity length

Requirements

How to

Results

BR

Recycling gains

How to

Results

BR

Reflectivity check

How to

Results

BR

Sensing matrix

How to

Results

BR

Actuator responses

How to

Results

BR

f2a filter adjustment

Requirement

How to

Results

BR

IFO modeling

How to

Results

BR

Suspension Positioning

Requirements

How to

Results

BR

Interferometer_Characterization (last edited 2012-03-11 03:31:49 by KiwamuizumiATligoDOTorg)