= Interferometer Characterization =
== Goals and Motivations ==
= Interferometer Characterization at the 40m prototype =
== Goals ==
 . ''''' To help the DRMI commissioning which will be performed at LLO.'''''
== Motivations ==
 . In the aLIGO schedule ''''' a DRMI test will start on May 2011 at LLO. ''''' Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and painless at the site. Moreover any commissioning test that will be performed at LLO should have been well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues.
 . So for this purpose some recipes must be prepared. Each recipe includes descriptions about how to make a commissioning test, how to estimate important parameters and the results at the 40m. In this page those recipes are described together with the results at the 40m.
Line 11: Line 15:
= Characterization Plan at the 40m = = DRMI Characterization Plan at the 40m =
Line 13: Line 17:
=== Requirement ===
Line 18: Line 23:
=== Requirements ===
Line 26: Line 32:


== Reflectivity check ==
=== How to ===
=== Results ===
[[BR]]
Line 36: Line 49:

== f2a filter adjustment ==
=== Requirement ===
=== How to ===
=== Results ===

[[BR]]
== IFO modeling ==
=== How to ===
=== Results ===

[[BR]]
== Suspension Positioning ==
=== Requirements ===
=== How to ===
=== Results ===

[[BR]]

Interferometer Characterization at the 40m prototype

Goals

  • To help the DRMI commissioning which will be performed at LLO.

Motivations

  • In the aLIGO schedule a DRMI test will start on May 2011 at LLO. Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and painless at the site. Moreover any commissioning test that will be performed at LLO should have been well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues.

  • So for this purpose some recipes must be prepared. Each recipe includes descriptions about how to make a commissioning test, how to estimate important parameters and the results at the 40m. In this page those recipes are described together with the results at the 40m.

BR BR BR


BR

DRMI Characterization Plan at the 40m

Schnupp asymmetry

Requirement

How to

Results

BR

Cavity length

Requirements

How to

Results

BR

Recycling gains

How to

Results

BR

Reflectivity check

How to

Results

BR

Sensing matrix

How to

Results

BR

Actuator responses

How to

Results

BR

f2a filter adjustment

Requirement

How to

Results

BR

IFO modeling

How to

Results

BR

Suspension Positioning

Requirements

How to

Results

BR