Differences between revisions 19 and 29 (spanning 10 versions)
Revision 19 as of 2011-06-06 21:36:15
Size: 1819
Editor: KiwamuIzumi
Comment:
Revision 29 as of 2011-06-07 05:38:43
Size: 3119
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 . In the aLIGO schedule ''''' a DRMI test will start on May 2011 at LLO. ''''' Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and hence allow to finish the commissioning in shorter time. Moreover any commissioning tests that will be performed at LLO should be well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues.  . In the aLIGO schedule ''''' a DRMI test will start on May 2011 at LLO. ''''' Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and hence allow to finish the commissioning in the shortest time. Moreover any commissioning tests that will be performed at LLO should be well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues.
Line 12: Line 12:
[[BR]]
Line 13: Line 14:
[[BR]]  <<Anchor(plantop)>>
Line 15: Line 16:
== Schnupp asymmetry measurement == == Schnupp asymmetry measurement and its adjustment ==
Line 17: Line 18:
  . {{{
 Schnupp asymmetry = 0.0342 [m] + XXX [mm] - YYY [mm]
}}}
 . Since Schnupp asymmetry determines the transmissivity of the
Michelson part and hence compose ..
Line 18: Line 25:
 . Here is an instruction how to measure the Schnupp asymmetry.
Line 19: Line 27:
[[BR]]  . The result at the 40m was ... and the precision was +/- XXX mm. This implies us to fix the length of the asymmetry.
Line 21: Line 29:
== Cavity length measurements ==
[[BR]][[BR]]


== PRC length measurement and its adjustment ==
Line 23: Line 35:
 . {{{ lprc = 6.7538 [m] +/- XXX [mm]
}}}
 . In order to resonate both f1 and f2 sidebands the length should be adjusted to ..

 . In addition to that the arm makes the non-zero phase shift on these sidebands and makes the ..
Line 24: Line 42:
 . To measure the length of the recycling cavity,
Line 25: Line 45:
[[BR]]  .
[[BR]][[BR]]

== SRC length measurement ==
=== Requirements ===
 . {{{ lsrc = 5.39915 [m] +/- XXX mm
 }}}
=== How to ===
 .
=== Results ===
 .
[[BR]][[BR]]
Line 28: Line 60:
 . Since the recycling gain is related to loss in the recycling cavity,...
Line 29: Line 62:
 .
Line 30: Line 64:
[[BR]]  . {{{
 Carrirer = XX
 f1 sideband = YY
 f2 sideband = ZZ
}}}
[[BR]][[BR]]
Line 32: Line 71:
== Beam spot position on BS ==
=== Requirements ===
{{{ off-centering < XXX mm
}}}
 . To get a clean AS signal

=== How to ===
=== results ===
Line 36: Line 83:
[[BR]] [[BR]][[BR]]
Line 42: Line 89:
[[BR]] [[BR]][[BR]]
Line 47: Line 94:
[[BR]] [[BR]][[BR]]
Line 53: Line 100:
[[BR]][[BR]]
Line 54: Line 102:
[[BR]]
Line 58: Line 105:
[[BR]][[BR]]
Line 59: Line 107:
[[BR]]
Line 64: Line 111:
[[BR]][[BR]]
Line 65: Line 113:
[[BR]]
Line 68: Line 115:
[[BR]][[BR]]

== MICH actuator decoupling ==
=== Requirements ===
=== How to ===
[[BR]]
[[BR]]

[#plantop back to top]

Interferometer Characterization at the 40m prototype

Goals

  • To help the DRMI commissioning that will be performed at LLO.

Motivations

  • In the aLIGO schedule a DRMI test will start on May 2011 at LLO. Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and hence allow to finish the commissioning in the shortest time. Moreover any commissioning tests that will be performed at LLO should be well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues.

  • So for this purpose some recipes must be prepared by the 40m lab. Each recipe includes descriptions about how to make a commissioning test, how to estimate important parameters and the results at the 40m. Additionally some useful scripts must be developed at the 40m.

BR BR

BR


DRMI Characterization Plan at the 40m

Schnupp asymmetry measurement and its adjustment

Requirement

  •  Schnupp asymmetry = 0.0342 [m] + XXX [mm] - YYY [mm]
  • Since Schnupp asymmetry determines the transmissivity of the

Michelson part and hence compose ..

How to

  • Here is an instruction how to measure the Schnupp asymmetry.

Results

  • The result at the 40m was ... and the precision was +/- XXX mm. This implies us to fix the length of the asymmetry.

BRBR

PRC length measurement and its adjustment

Requirements

  • {{{ lprc = 6.7538 [m] +/- XXX [mm]

}}}

  • In order to resonate both f1 and f2 sidebands the length should be adjusted to ..
  • In addition to that the arm makes the non-zero phase shift on these sidebands and makes the ..

How to

  • To measure the length of the recycling cavity,

Results

BRBR

SRC length measurement

Requirements

  • {{{ lsrc = 5.39915 [m] +/- XXX mm }}}

How to

Results

BRBR

Recycling gain measurements

  • Since the recycling gain is related to loss in the recycling cavity,...

How to

Results

  •  Carrirer    = XX
     f1 sideband = YY
     f2 sideband = ZZ

BRBR

Beam spot position on BS

Requirements

{{{ off-centering < XXX mm }}}

  • To get a clean AS signal

How to

results

Reflectivity check

How to

Results

BRBR

Sensing matrix check

How to

Results

BRBR

Calibration of Actuator responses

How to

Results

BRBR

f2a filter adjustment

Requirement

How to

Results

BRBR

IFO modeling

How to

Results

BRBR

Estimation of Suspensions' Position

Requirements

How to

Results

BRBR

Locking procedure

How to

BRBR

MICH actuator decoupling

Requirements

How to

BR BR

[#plantop back to top]

Interferometer_Characterization (last edited 2012-03-11 03:31:49 by KiwamuizumiATligoDOTorg)