Differences between revisions 17 and 22 (spanning 5 versions)
Revision 17 as of 2011-06-06 21:34:13
Size: 1748
Editor: KiwamuIzumi
Comment:
Revision 22 as of 2011-06-06 21:40:14
Size: 1959
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 . In the aLIGO schedule ''''' a DRMI test will start on May 2011 at LLO. ''''' Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and hence allow to finish the commissioning in shorter time. Moreover any commissioning tests that will be performed at LLO should be well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues.  . In the aLIGO schedule ''''' a DRMI test will start on May 2011 at LLO. ''''' Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and hence allow to finish the commissioning in the shortest time. Moreover any commissioning tests that will be performed at LLO should be well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues.
Line 15: Line 15:
== Schnupp asymmetry == == Schnupp asymmetry measurement ==
Line 19: Line 19:
[[BR]] [[BR]][[BR]]
Line 21: Line 21:
== Cavity length == == Cavity length measurements ==
Line 25: Line 25:
[[BR]] [[BR]][[BR]]
Line 27: Line 27:
== Recycling gains == == Recycling gain measurements ==
Line 30: Line 30:
[[BR]] [[BR]][[BR]]
Line 36: Line 36:
[[BR]] [[BR]][[BR]]
Line 39: Line 39:
== Sensing matrix == == Sensing matrix check ==
Line 42: Line 42:
[[BR]] [[BR]][[BR]]
Line 44: Line 44:
== Actuator responses == == Calibration of Actuator responses ==
Line 47: Line 47:
[[BR]] [[BR]][[BR]]
Line 53: Line 53:
[[BR]][[BR]]
Line 54: Line 55:
[[BR]]
Line 58: Line 58:
[[BR]][[BR]]
Line 59: Line 60:
[[BR]]
== Suspension Positioning ==
== Estimation of Suspensions' Position ==
Line 64: Line 64:
[[BR]][[BR]]
Line 65: Line 66:
[[BR]]
Line 68: Line 68:
[[BR]][[BR]]

== MICH actuator decoupling ==
=== Requirements ===
=== How to ===

Interferometer Characterization at the 40m prototype

Goals

  • To help the DRMI commissioning that will be performed at LLO.

Motivations

  • In the aLIGO schedule a DRMI test will start on May 2011 at LLO. Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and hence allow to finish the commissioning in the shortest time. Moreover any commissioning tests that will be performed at LLO should be well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues.

  • So for this purpose some recipes must be prepared by the 40m lab. Each recipe includes descriptions about how to make a commissioning test, how to estimate important parameters and the results at the 40m. Additionally some useful scripts must be developed at the 40m.

BR BR


BR

DRMI Characterization Plan at the 40m

Schnupp asymmetry measurement

Requirement

How to

Results

BRBR

Cavity length measurements

Requirements

How to

Results

BRBR

Recycling gain measurements

How to

Results

BRBR

Reflectivity check

How to

Results

BRBR

Sensing matrix check

How to

Results

BRBR

Calibration of Actuator responses

How to

Results

BRBR

f2a filter adjustment

Requirement

How to

Results

BRBR

IFO modeling

How to

Results

BRBR

Estimation of Suspensions' Position

Requirements

How to

Results

BRBR

Locking procedure

How to

BRBR

MICH actuator decoupling

Requirements

How to

Interferometer_Characterization (last edited 2012-03-11 03:31:49 by KiwamuizumiATligoDOTorg)