|
Size: 1427
Comment:
|
Size: 1621
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 5: | Line 5: |
| . In the aLIGO schedule ''''' a DRMI test will start on May 2011 at LLO. ''''' Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and painless at the site. Moreover any commissioning test that will be performed at LLO should have been well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning test and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues. | . In the aLIGO schedule ''''' a DRMI test will start on May 2011 at LLO. ''''' Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and painless at the site. Moreover any commissioning test that will be performed at LLO should have been well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues. . So for this purpose some recipes must be prepared. Each recipe includes descriptions about how to make a commissioning test, how to estimate important parameters and the results at the 40m. |
Interferometer Characterization at the 40m prototype
Goals
The goal is to help the DRMI commissioning which will be performed at LLO.
Motivations
In the aLIGO schedule a DRMI test will start on May 2011 at LLO. Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and painless at the site. Moreover any commissioning test that will be performed at LLO should have been well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues.
- So for this purpose some recipes must be prepared. Each recipe includes descriptions about how to make a commissioning test, how to estimate important parameters and the results at the 40m.
Contents
DRMI Characterization Plan at the 40m
Schnupp asymmetry
Requirement
How to
Results
Cavity length
Requirements
How to
Results
Recycling gains
How to
Results
Reflectivity check
How to
Results
Sensing matrix
How to
Results
Actuator responses
How to
Results
f2a filter adjustment
Requirement
How to
Results
IFO modeling
How to
Results
Suspension Positioning
Requirements
How to
