= Interferometer Characterization = = Interferometer Characterization at the 40m prototype =
== Goals ==
 . ''''' To help the DRMI commissioning that will be performed at LLO.'''''
== Motivations ==
 . In the aLIGO schedule ''''' a DRMI test will start on May 2011 at LLO. ''''' Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and hence allow to finish the commissioning in the shortest time. Moreover any commissioning tests that will be performed at LLO should be well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues.
 . So for this purpose some recipes must be prepared by the 40m lab. Each recipe includes descriptions about how to make a commissioning test, how to estimate important parameters and the results at the 40m. Additionally some useful scripts must be developed at the 40m.

[[BR]]
[[BR]]

<<TableOfContents(3)>>
[[BR]]
-------
 <<Anchor(plantop)>>
= DRMI Characterization Plan at the 40m =
== Schnupp asymmetry measurement and its adjustment ==
=== Requirement ===
  . {{{
 Schnupp asymmetry = 0.0342 [m] + XXX [mm] - YYY [mm]
}}}
 . Since Schnupp asymmetry determines the transmissivity of the
Michelson part and hence compose ..

=== How to ===
 . Here is an instruction how to measure the Schnupp asymmetry.
=== Results ===
 . The result at the 40m was ... and the precision was +/- XXX mm. This implies us to fix the length of the asymmetry.


[[BR]][[BR]]


== PRC length measurement and its adjustment ==
=== Requirements ===
 . {{{ lprc = 6.7538 [m] +/- XXX [mm]
}}}
 . In order to resonate both f1 and f2 sidebands the length should be adjusted to ..

 . In addition to that the arm makes the non-zero phase shift on these sidebands and makes the ..

=== How to ===
 . To measure the length of the recycling cavity,

=== Results ===
 .
[[BR]][[BR]]

== SRC length measurement ==
=== Requirements ===
 . {{{ lsrc = 5.39915 [m] +/- XXX mm
 }}}
=== How to ===
 .
=== Results ===
 .
[[BR]][[BR]]


== Recycling gain measurements ==
 . Since the recycling gain is related to loss in the recycling cavity,...
=== How to ===
 .
=== Results ===
 .
[[BR]][[BR]]

== Beam spot position on BS ==
=== Requirements ===
{{{ off-centering < XXX mm
}}}
 . To get a clean AS signal

=== How to ===
=== results ===

== Reflectivity check ==
=== How to ===
=== Results ===
[[BR]][[BR]]


== Sensing matrix check ==
=== How to ===
=== Results ===
[[BR]][[BR]]

== Calibration of Actuator responses ==
=== How to ===
=== Results ===
[[BR]][[BR]]

== f2a filter adjustment ==
=== Requirement ===
=== How to ===
=== Results ===
[[BR]][[BR]]

== IFO modeling ==
=== How to ===
=== Results ===
[[BR]][[BR]]

== Estimation of Suspensions' Position ==
=== Requirements ===
=== How to ===
=== Results ===
[[BR]][[BR]]

== Locking procedure ==
=== How to ===
[[BR]][[BR]]

== MICH actuator decoupling ==
=== Requirements ===
=== How to ===
[[BR]]
[[BR]]

[#plantop back to top]

Interferometer Characterization at the 40m prototype

Goals

  • To help the DRMI commissioning that will be performed at LLO.

Motivations

  • In the aLIGO schedule a DRMI test will start on May 2011 at LLO. Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and hence allow to finish the commissioning in the shortest time. Moreover any commissioning tests that will be performed at LLO should be well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues.

  • So for this purpose some recipes must be prepared by the 40m lab. Each recipe includes descriptions about how to make a commissioning test, how to estimate important parameters and the results at the 40m. Additionally some useful scripts must be developed at the 40m.

BR BR

BR


DRMI Characterization Plan at the 40m

Schnupp asymmetry measurement and its adjustment

Requirement

  •  Schnupp asymmetry = 0.0342 [m] + XXX [mm] - YYY [mm]
  • Since Schnupp asymmetry determines the transmissivity of the

Michelson part and hence compose ..

How to

  • Here is an instruction how to measure the Schnupp asymmetry.

Results

  • The result at the 40m was ... and the precision was +/- XXX mm. This implies us to fix the length of the asymmetry.

BRBR

PRC length measurement and its adjustment

Requirements

  • {{{ lprc = 6.7538 [m] +/- XXX [mm]

}}}

  • In order to resonate both f1 and f2 sidebands the length should be adjusted to ..
  • In addition to that the arm makes the non-zero phase shift on these sidebands and makes the ..

How to

  • To measure the length of the recycling cavity,

Results

BRBR

SRC length measurement

Requirements

  • {{{ lsrc = 5.39915 [m] +/- XXX mm }}}

How to

Results

BRBR

Recycling gain measurements

  • Since the recycling gain is related to loss in the recycling cavity,...

How to

Results

BRBR

Beam spot position on BS

Requirements

{{{ off-centering < XXX mm }}}

  • To get a clean AS signal

How to

results

Reflectivity check

How to

Results

BRBR

Sensing matrix check

How to

Results

BRBR

Calibration of Actuator responses

How to

Results

BRBR

f2a filter adjustment

Requirement

How to

Results

BRBR

IFO modeling

How to

Results

BRBR

Estimation of Suspensions' Position

Requirements

How to

Results

BRBR

Locking procedure

How to

BRBR

MICH actuator decoupling

Requirements

How to

BR BR