|
Size: 37
Comment:
|
Size: 1748
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 1: | Line 1: |
| = Interferometer Characterization = | = Interferometer Characterization at the 40m prototype = == Goals == . ''''' To help the DRMI commissioning that will be performed at LLO.''''' == Motivations == . In the aLIGO schedule ''''' a DRMI test will start on May 2011 at LLO. ''''' Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and hence allow to finish the commissioning in shorter time. Moreover any commissioning tests that will be performed at LLO should be well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues. . So for this purpose some recipes must be prepared by the 40m lab. Each recipe includes descriptions about how to make a commissioning test, how to estimate important parameters and the results at the 40m. Additionally some useful scripts must be developed at the 40m. [[BR]] [[BR]] <<TableOfContents(3)>> ------- [[BR]] = DRMI Characterization Plan at the 40m = == Schnupp asymmetry == === Requirement === === How to === === Results === [[BR]] == Cavity length == === Requirements === === How to === === Results === [[BR]] == Recycling gains == === How to === === Results === [[BR]] == Reflectivity check == === How to === === Results === [[BR]] == Sensing matrix == === How to === === Results === [[BR]] == Actuator responses == === How to === === Results === [[BR]] == f2a filter adjustment == === Requirement === === How to === === Results === [[BR]] == IFO modeling == === How to === === Results === [[BR]] == Suspension Positioning == === Requirements === === How to === === Results === [[BR]] == Locking procedure == === How to === |
Interferometer Characterization at the 40m prototype
Goals
To help the DRMI commissioning that will be performed at LLO.
Motivations
In the aLIGO schedule a DRMI test will start on May 2011 at LLO. Prior to the DRMI test we, the 40m lab, should help their commissioning to make the things smooth and hence allow to finish the commissioning in shorter time. Moreover any commissioning tests that will be performed at LLO should be well predicted and tested at the 40m so that the people at the site can easily pass through all the commissioning tests and possibly can spend time for a real trouble shooting (commissioning) to fix unexpected issues.
- So for this purpose some recipes must be prepared by the 40m lab. Each recipe includes descriptions about how to make a commissioning test, how to estimate important parameters and the results at the 40m. Additionally some useful scripts must be developed at the 40m.
Contents
DRMI Characterization Plan at the 40m
Schnupp asymmetry
Requirement
How to
Results
Cavity length
Requirements
How to
Results
Recycling gains
How to
Results
Reflectivity check
How to
Results
Sensing matrix
How to
Results
Actuator responses
How to
Results
f2a filter adjustment
Requirement
How to
Results
IFO modeling
How to
Results
Suspension Positioning
Requirements
How to
Results
Locking procedure
