Before placing installing the DC OMC and OMMT in the vacuum system we have to pre-align it on the flow benches in the clean room: 1. use 500 mW (750?) NPRO, fiber coupled 1. use auto-collimators and mirror flats to align and infinity focus OMMT 1. use few cm beam expanded fiber output to align OMMT to OMC walk mirrors 1. use OMC refl to maximize mode matching and walk in the OMMT alignment 1. align, mount, and register OMC DC PDs 1. configure back propagating fiber and mode-match it 1. Need to configure a temporary diode to measure the leakage field from on of the OMC end mirrors.