|
Size: 358
Comment:
|
Size: 715
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 2: | Line 2: |
| For the 40m Upgrade there will be changes in the configuration of the photodiodes. The new optical setup and a new locking scheme will demand some changes in the present configuration of RF PDs, DC PDs and QPDs. | For the 40m Upgrade there will be changes in the configuration of the photodiodes. Chnges in the configuration of the photodiodes will mostly dictated by: 1) the adoption of different modulation sibands than the current ones; 2) the introduction of 3f locking techniques; 3) the use of an additional green laser beam. |
| Line 4: | Line 4: |
| [attachment: These slides] contain a draft of expected changes in the PD endowment. | A different configuration of the demodulator will also be necessary fo the new RF signals. The following diagrams and tables summarize which changes will have to happen. [attachment:40mUpgrade_PDlists.pdf Table of old and new PDs plus diagram of signal extraction scheme] [attachment:40mPDs.pdf Table of PDs and Demodulators] |
Changes in the configuration of the photodiodes
For the 40m Upgrade there will be changes in the configuration of the photodiodes. Chnges in the configuration of the photodiodes will mostly dictated by: 1) the adoption of different modulation sibands than the current ones; 2) the introduction of 3f locking techniques; 3) the use of an additional green laser beam.
A different configuration of the demodulator will also be necessary fo the new RF signals.
The following diagrams and tables summarize which changes will have to happen.
[attachment:40mUpgrade_PDlists.pdf Table of old and new PDs plus diagram of signal extraction scheme]
[attachment:40mPDs.pdf Table of PDs and Demodulators]
