|
Size: 302
Comment:
|
Size: 608
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 1: | Line 1: |
| Th 40m Upgrade Frequency Generation Box is going to going to be installed in the 1Y1 rack. It is going to generate the modulation and the demodulation frequencies. | The 40m Upgrade Frequency Generation Box is going to be installed in the 1Y1 rack. It will be used to generate the modulation and the demodulation frequencies. |
| Line 3: | Line 3: |
| <<TableOfContents(2)>> == Picures == |
|
| Line 7: | Line 10: |
| <<TableOfContents(2)>> | == Assembling Parts == * Teflon sheet: 12"x13"x3/8" McMaster Catalog [http://www.mcmaster.com/itm/find.ASP?tab=find&context=psrchDtlLink&fasttrack=False&searchstring=8545K27 8545K27] * Ceramic Spacers: * LIGO Standard 4-pin power connector (in Downs, drill room bin 108/6) * == Links == |
The 40m Upgrade Frequency Generation Box is going to be installed in the 1Y1 rack. It will be used to generate the modulation and the demodulation frequencies.
Contents
Picures
This is the first picture as I start putting it together.
Assembling Parts
Teflon sheet: 12"x13"x3/8" McMaster Catalog [http://www.mcmaster.com/itm/find.ASP?tab=find&context=psrchDtlLink&fasttrack=False&searchstring=8545K27 8545K27]
- Ceramic Spacers:
- LIGO Standard 4-pin power connector (in Downs, drill room bin 108/6)
