RF Photodetectors

This page (and only this page) contains all of the RF Photodetector data for the 40m. If you find pages elsewhere in this wiki, move them here.

11 MHz

22 MHz

29.5 MHz

33 MHz

55 MHz

110 MHz

AS

/AS11

/AS55

REFL

/REFL11

/REFL55

POP

POY

/POY11

MCREFL

MOVE ALL RFPD DATA to Electronics/RFPD/

State of PD Upgrade

Name

Role\State

Schematic

Optical Response

Noise at Resonant Freq.

REFL11

[attachment:]

[attachment:2010-05-03_REFL11_CalibratedOpticalResponse.png 0-200 MHz]

[attachment:2010-05-09_REFL11_CalibratedOpticalResponse0-500MHz_uncalibrated.png 0-500 MHz]

[attachment:2010-04-09_REFL11NoiseMeasurements.png noise]

REFL55

[attachment:]

[attachment:2010-05-03_REFL55_CalibratedOpticalResponse.png 0-200 MHz]

[attachment:2010-05-09_REFL55_CalibratedOpticalResponse0-500MHz_uncalibrated.png 0-500 MHz]

[attachment:]

AS55

[attachment:]

[attachment:2010-05-05_AS55_CalibratedOpticalResponse.png 0-200 MHz]

[attachment:2010-05-08_AS55_CalibratedOpticalResponse0-500MHz_uncalibrated.png 0-500 MHz]

[attachment:2010-05-05_AS55_NoiseMeasurements.png noise]

POX

[attachment:POX11.png schematic]

[attachment:2010-05-05_POX11_CalibratedOpticalResponse_0-200MHz.png 0-200 MHz]

[attachment:2010-05-08_POX11_CalibratedOpticalResponse0-500MHz_uncalibrated.png 0-500 MHz]

[attachment:2010-05-05_POX11_NoiseMeasurements.png noise]

POY

[attachment:POX11.png schematic]

[attachment:2010-05-05_POY11_CalibratedOpticalResponse_0-200MHz.png 0-200 MHz]

[attachment:2010-05-10_POY11_CalibratedOpticalResponse0-500MHz.png 0-500 MHz]

[attachment:2010-05-09_POY11_NoiseMeasurements.png noise]

POP11

POP55

SPOB

REFL165

REFL33


Table of Contents


Documentation

In [https://nodus.ligo.caltech.edu:30889/svn/trunk/alberto/40mUpgrade/RFsystem/RFPDs/RFPDupgradeProcedure/RFPDupgradeProcedure.pdf this document] I explain all the steps of the 40m RF PD upgrade process.

SVN Repository

All the material relative to the upgrade of the RFPD for the 40m can be found in the 40m SVN repository under the following path:

https://nodus.ligo.caltech.edu:30889/svn/trunk/alberto/40mUpgrade/RFsystem/RFPDs/


Expected Power at the Ports

Arm Length = 38m

attachment:Field_RF_Power_38m.png

Arm Length = 37.5m

attachment:Field_RF_Power_375m.png


REFL11

attachment:40mUpgradeREFL11schematic.pdf

Schematic

Changes

Converted from PD2 (ex REFL33) with the following changes:

[https://nodus.ligo.caltech.edu:30889/svn/trunk/alberto/40mUpgrade/RFsystem/RFPDs/RFPDlisoModels/RFPD11/rfpd11_testinput.fil REFL11 reference LISO model]

[https://nodus.ligo.caltech.edu:30889/svn/trunk/alberto/40mUpgrade/RFsystem/RFPDs/REFL11/REFL11Schematics/40mUpgradeREFL11schematic.pdf REFL11 New Schematic]

[https://nodus.ligo.caltech.edu:30889/svn/trunk/alberto/40mUpgrade/RFsystem/RFPDs/REFL11/2010-03-23_REFL11_model_to_meas_comparison.png REFL11 Measured Transfer Functions vs LISO model]

Data Files

Notes

Still To Do


REFL55

Schematic

attachment:40mUpgradeREFL55schematic.pdf

Changes

Converted from PD6 (ex REFL199) with the following changes:

Data Files

Still to do

Notes


AS55

Schematic

attachment:40mUpgradeAS55schematic.pdf

Changes

Converted from PD9 (ex ASDD_133) with the following changes:

Data Files

Notes

Some notes from Hartmut's commissioning of this PD in 2004 in the elog entries:

Still to do


POX11

Schematic

Changes

Data Files

Notes

Still to do


POY11

Schematic

Changes

Output Signal

Data Files

Notes

Still to do


Things to do

Make label stickers for each photodiode, with: