Detailed Vent Plan: Detailed Vent Plan: 
Line 3: Line 3:
0) Fill Vacuum with Air -1) Preparations for vent:

 * Steve will prepare baseline readings for IOOPOS, IOOANG, IPPOS and IPANG QPDs,
  . all the oplev QPDs, and any/all other QPDs that are useful. DONE.
 * We might want to lock the arms, and take baseline trends
  . of the DC power on all the photodiodes that can be trended. DONE.
 * Shall we keep the MC2 QPD on the transmitted beam,
  . or move it back to the oplev beam?
 * [[OSEM_adjustment_proceedure]]
 * Rana will lock the arms and measure the angle-to-length couplings of the ITMs. DONE.
    If the beam is not centered horizontally on ITMX, we can think about moving it during the vent.

-0.5) Establish SRM + OO table alignment, as referenced to AP table

 * Install CrystaLaser at AP. This will be like a long, IR oplev. DONE.
 * Verify that this beam is co-linear with current darkport beam. DONE.

-0.1) Recenter Oplevs, check that computer systems are working (testpoints, etc) DONE.

0) Fill Vacuum with Air. DONE.

Mis-align MC2 to prevent flashes?
Line 7: Line 28:
 * OO: ND and AC
 *
IO: AC
 * OO: ND and AC IN PROGRESS.
Line 14: Line 34:
2) Fix OSEMS on MC2, BS, PRM, SRM 2) Fix OSEMS on MC2, BS, PRM ---> IN PROGRESS. MC2 DONE.
Line 16: Line 36:
Mis-align MC2 to prevent flashes? Maybe wait on SRM till the end, since it is our reference for aligning the back-propagating beam from the DC PD, retroreflecting off of the SRM back to the DCPD.
Line 20: Line 40:
3) *Install fixed mount fiber launch at AP? 2.7) Install new window on OOC.
Line 22: Line 42:
 * Verify that this fiber beam is co-linear with current darkport beam. 3) Install DC readout optics
Line 24: Line 44:
4) *Move OMMT assembly to OO chamber, place according to drawing.  * position electronics, wiring, and other necessary equipment near the OOC for biasing the TT PZTs,
  . locking the OMC, and alignment.
  1. Necessary equipment includes, but is not limited to:
  1. PZT driver (OMC L)
  1. Lock-in Amp (SR830)
  1. Cabling (many BNCs), cross-connects for Vacuum flange
  1. SR560
  1. fibercoupled laser DONE
  1. High-Voltage power supply (for TTPZT), with cabling and cross connects to power mirrors in TWO chambers.
  1. Power supply for DC PD
  1. Four channel color scope
Line 26: Line 56:
 * Place 4 spherical washers to support OMC breadboard.
 * Move, and place OMC breadboard.
 * Remove handle from OMC breadboard.
 * Remove DCPD, install second fiber launch in its place.
 * Attach cable for OMC length, wire up a solution to drive it.
 * Install RF pickoff mirror. Use reflected beam to lock OMC
 * Place remaining optics rougly on table, including squeezer optics.
 * Measure levelness of OO optic table.
 * Bias tip-tilt PZT2 to the middle of its range.
 * Align PZT2 to hit the PZT1
 * Drape cable from ITMX to BSC
 * Bias PZT1 to middle of its range.
 * Align PZT1 so beam hits center of ITM?
 * Align RF pickoff mirror so back-reflection from SRM
 * Measure levelness of OO table with bubble DONE
 * Measure levelness of BSC table with bubble DONE
 * Measure levelness of ITMX table with bubble DONE
 * place iris on OO table, using CrystaLaser beam as reference. DONE
 * plase iris(es?) on BSC table, using CrystaLaser beam as reference. DONE (2)
 * place iris on ITMX table?, using CrystaLaser beam as reference. NOT DONE. DOOR WAS NOT REMOVED.
 * Move the cable stand on OOC table. DONE
 * REMOVE fixed AP steering mirror on OOC table. DONE
 * REMOVE weight from NW corner of OOC table. DONE
 * Place 4 spherical washers to support OMC breadboard. DONE.
 * Move, and place OMC breadboard. DONE.
 * Remove handle from OMC breadboard. DONE.
 * move OMMT assembly and place on OOC table. DONE.
 * secure OMC breadboard and OMMT to table. DONE.
 * Install TTPZT2 on OOC table. DONE.
 * Attach cable for OMC length PZT, wire up a solution to drive it. Test that it works properly. DONE.
 * Remove DCPD, install second fiber launch in its place. Lock the OMC backwards. DONE.
 * Install RF pickoff mirror and next steering mirror, and OMCT mirror. DONE.
 * Place remaining optics rougly on table, including squeezer optics. DONE.
 * Measure levelness of OO optic table. DONE.
 * Relevel the table, using the bubble and weights. DONE.
 * Verify alignment of fiber beam 2 through OMC, OMMT, RF pickoff mirror, to PZT2. DONE.
 * Bias tip-tilt PZT2 to the middle of its range. DONE.
 * Align PZT2 to hit the AP steering mirror 1, f-beam 2 to hit SRM and retroreflect to the OMC. DONE.
 * Run wiring from BSC to ITMX. Disconnect ITMX flag picomotor wiring. and replace with TTPZT1 wiring. DONE.
 * Check that both TT PZTs can be powered and biased. Simultaneously! DONE.
 * Remove AP steering mirror 1, replace with TTPZT1. DONE.
 * Bias PZT1 to middle of its range. DONE.
 * Align PZT1 so beam hits center of SRM, and then through to centers of ITMX and ITMY. NOT DONE.
 * Align RF pickoff mirror so back-reflection from SRM .....DONE
Line 41: Line 87:
  . with that from the first fiber, by moving a steering mirror on the   . with that from the CrystaLaser, by moving a steering mirror on the
  . AP table.
 * Align OMCT mirror. DONE.
 * Now the f-beam 1, coming from the original AP table and retroreflecting from the SRM, should be
  . visible near the input to the OMC.
 * Verify that OMCR and OMCT beams exit chamber. DONE.
 * remove Thorlabs diode used for locking OMC backwards. DONE.
 * Test that the OMMT and squeezer mirror picomotors can be controlled from the outside.
 * Comission the squeezer optics.
 * Relevel table again if movement occurs;
  . if so, double check alignment of fiber beam to SRM and back, and that APRF, OMCR, OMCT beams exit the chamber.
Line 43: Line 99:
  . AP table.
 * Relevel the table, using the bubble and also the beam from the first fiber?
 * Comission the squeezer optics. Relevel table again if movement occurs.
4) Fix OSEMS on SRM

Detailed Vent Plan:

-1) Preparations for vent:

  • Steve will prepare baseline readings for IOOPOS, IOOANG, IPPOS and IPANG QPDs,
    • all the oplev QPDs, and any/all other QPDs that are useful. DONE.
  • We might want to lock the arms, and take baseline trends
    • of the DC power on all the photodiodes that can be trended. DONE.
  • Shall we keep the MC2 QPD on the transmitted beam,
    • or move it back to the oplev beam?
  • OSEM_adjustment_proceedure

  • Rana will lock the arms and measure the angle-to-length couplings of the ITMs. DONE.
    • If the beam is not centered horizontally on ITMX, we can think about moving it during the vent.

-0.5) Establish SRM + OO table alignment, as referenced to AP table

  • Install CrystaLaser at AP. This will be like a long, IR oplev. DONE.

  • Verify that this beam is co-linear with current darkport beam. DONE.

-0.1) Recenter Oplevs, check that computer systems are working (testpoints, etc) DONE.

0) Fill Vacuum with Air. DONE.

Mis-align MC2 to prevent flashes?

1) Remove Doors and Access Connectors:

  • OO: ND and AC IN PROGRESS.
  • BSC: ND and ITMY AC
  • ITMY: AC
  • ITMX: ND
  • MC2: ?

2) Fix OSEMS on MC2, BS, PRM ---> IN PROGRESS. MC2 DONE.

Maybe wait on SRM till the end, since it is our reference for aligning the back-propagating beam from the DC PD, retroreflecting off of the SRM back to the DCPD.

2.5) Install half-wave plate to rotate polarization into the MC.

2.7) Install new window on OOC.

3) Install DC readout optics

  • position electronics, wiring, and other necessary equipment near the OOC for biasing the TT PZTs,
    • locking the OMC, and alignment.
    • Necessary equipment includes, but is not limited to:
    • PZT driver (OMC L)
    • Lock-in Amp (SR830)
    • Cabling (many BNCs), cross-connects for Vacuum flange
    • SR560
    • fibercoupled laser DONE
    • High-Voltage power supply (for TTPZT), with cabling and cross connects to power mirrors in TWO chambers.
    • Power supply for DC PD
    • Four channel color scope
  • Measure levelness of OO table with bubble DONE
  • Measure levelness of BSC table with bubble DONE
  • Measure levelness of ITMX table with bubble DONE
  • place iris on OO table, using CrystaLaser beam as reference. DONE

  • plase iris(es?) on BSC table, using CrystaLaser beam as reference. DONE (2)

  • place iris on ITMX table?, using CrystaLaser beam as reference. NOT DONE. DOOR WAS NOT REMOVED.

  • Move the cable stand on OOC table. DONE
  • REMOVE fixed AP steering mirror on OOC table. DONE
  • REMOVE weight from NW corner of OOC table. DONE
  • Place 4 spherical washers to support OMC breadboard. DONE.
  • Move, and place OMC breadboard. DONE.
  • Remove handle from OMC breadboard. DONE.
  • move OMMT assembly and place on OOC table. DONE.
  • secure OMC breadboard and OMMT to table. DONE.
  • Install TTPZT2 on OOC table. DONE.
  • Attach cable for OMC length PZT, wire up a solution to drive it. Test that it works properly. DONE.
  • Remove DCPD, install second fiber launch in its place. Lock the OMC backwards. DONE.
  • Install RF pickoff mirror and next steering mirror, and OMCT mirror. DONE.
  • Place remaining optics rougly on table, including squeezer optics. DONE.
  • Measure levelness of OO optic table. DONE.
  • Relevel the table, using the bubble and weights. DONE.
  • Verify alignment of fiber beam 2 through OMC, OMMT, RF pickoff mirror, to PZT2. DONE.
  • Bias tip-tilt PZT2 to the middle of its range. DONE.
  • Align PZT2 to hit the AP steering mirror 1, f-beam 2 to hit SRM and retroreflect to the OMC. DONE.
  • Run wiring from BSC to ITMX. Disconnect ITMX flag picomotor wiring. and replace with TTPZT1 wiring. DONE.
  • Check that both TT PZTs can be powered and biased. Simultaneously! DONE.
  • Remove AP steering mirror 1, replace with TTPZT1. DONE.
  • Bias PZT1 to middle of its range. DONE.
  • Align PZT1 so beam hits center of SRM, and then through to centers of ITMX and ITMY. NOT DONE.
  • Align RF pickoff mirror so back-reflection from SRM .....DONE
    • can exit chamber. This beam can then be made co-linear
    • with that from the CrystaLaser, by moving a steering mirror on the

    • AP table.
  • Align OMCT mirror. DONE.
  • Now the f-beam 1, coming from the original AP table and retroreflecting from the SRM, should be
    • visible near the input to the OMC.
  • Verify that OMCR and OMCT beams exit chamber. DONE.
  • remove Thorlabs diode used for locking OMC backwards. DONE.
  • Test that the OMMT and squeezer mirror picomotors can be controlled from the outside.
  • Comission the squeezer optics.
  • Relevel table again if movement occurs;
    • if so, double check alignment of fiber beam to SRM and back, and that APRF, OMCR, OMCT beams exit the chamber.

4) Fix OSEMS on SRM

5) Pack up and get out.