Detailed Vent Plan:

0) Fill Vacuum with Air

1) Remove Doors and Access Connectors:

  • OO: ND and AC
  • IO: AC
  • BSC: ND and ITMY AC
  • ITMY: AC
  • ITMX: ND
  • MC2: ?

2) Fix OSEMS on MC2, BS, PRM, SRM

Mis-align MC2 to prevent flashes?

2.5) Install half-wave plate to rotate polarization into the MC.

3) *Install fixed mount fiber launch at AP?

  • Verify that this fiber beam is co-linear with current darkport beam.

4) *Move OMMT assembly to OO chamber, place according to drawing.

  • Place 4 spherical washers to support OMC breadboard.
  • Move, and place OMC breadboard.
  • Remove handle from OMC breadboard.
  • Remove DCPD, install second fiber launch in its place.
  • Attach cable for OMC length, wire up a solution to drive it.
  • Install RF pickoff mirror. Use reflected beam to lock OMC
  • Place remaining optics rougly on table, including squeezer optics.
  • Measure levelness of OO optic table.
  • Bias tip-tilt PZT2 to the middle of its range.
  • Align PZT2 to hit the PZT1
  • Drape cable from ITMX to BSC
  • Bias PZT1 to middle of its range.
  • Align PZT1 so beam hits center of ITM?
  • Align RF pickoff mirror so back-reflection from SRM
    • can exit chamber. This beam can then be made co-linear
    • with that from the first fiber, by moving a steering mirror on the
    • AP table.
  • Relevel the table, using the bubble and also the beam from the first fiber?
  • Comission the squeezer optics. Relevel table again if movement occurs.

5) Pack up and get out.