|
Size: 1620
Comment:
|
Size: 1478
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 3: | Line 3: |
| [[Laser Noise Couplings]] | |
| Line 4: | Line 5: |
| [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCreadout_InVacLayout.jpg "In-vacuum layout drawing"] | [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/40mDCdetect.pdf Proposal for a Homodyne (DC) Detection Experiment at the LIGO Caltech 40-Meter Laboratory, LIGO-T050086-00-R 6/20/2005] |
| Line 6: | Line 7: |
| [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DC_Detect_wiring.pdf "DC Detection Wiring diagram 8/31/06"] | [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/40mDetect_050719.pdf Plans for DC Readout Experiment at the 40m Lab, G050324-00-R, 7/19/05] <<ImageLink(http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCreadout_InVacLayout.jpg,width=500)>> [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCreadout_InVacLayout.jpg In-vacuum layout drawing] [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DC_Detect_wiring.pdf DC Detection Wiring diagram 8/31/06] |
| Line 9: | Line 15: |
| * [http://www.ligo.caltech.edu/~rward/dcreadout/OOwiring.pdf] * [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCdetectWiring.pdf] * [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/D060096-00-40M_DC_Detection_Wiring.pdf] * [http://www.ligo.caltech.edu/~swaldman/DitherLock_Strawman_V3.pdf] |
* [http://www.ligo.caltech.edu/~rward/dcreadout/OOwiring.pdf] * [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCdetectWiring.pdf] * [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/D060096-00-40M_DC_Detection_Wiring.pdf] * [http://www.ligo.caltech.edu/~swaldman/DitherLock_Strawman_V3.pdf] |
| Line 18: | Line 24: |
| [[DC Readout Electronics]] |
|
| Line 20: | Line 28: |
| Vacuum opening [[Plan of Action]] | DC readout installation during [[Vent_Sep_2006]] |
| Line 22: | Line 30: |
| Lessons learned in prep for next generation [[Lessons Learned]] | Post-vent [[Planned Measurements and Procedures]] [[Lessons Learned]] in preparation for next generation |
| Line 25: | Line 35: |
| = Next Generation DC Readout Notes = * Put the resistors on the PD block, not the nipple. * Wider separation for the PDs so the ghost beam can get wedged out. * Black glass ring around the PD cans to catch the 1st ghost beam. * Black glass dumps all over the place for the leak throughs. Optic mounts should have their own dumps. * Don't use any of the Piezo-Jena crap. * Don't use copper for the OMC body. All fused-silica, all the time. * Don't use a teensy mirror in the OMC. Calculate the needed resonant frequency. * Make both curved mirrors on a OMMT movable? And Bigger? * always draw ALL the dogs for EVERYTHING * CVI mirrors coated for 45P don't get better than ~98% reflectivity * Is it OK to change to use a fused silica baseplate with optically contacted mirrors? |
== DC Photodiode Preamp == attachment:DCPD_12_12_06_new.png attachment:DCPD_12_12_06_new.pdf -------- |
Version 0.1 DC Readout / OMC System
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/40mDCdetect.pdf Proposal for a Homodyne (DC) Detection Experiment at the LIGO Caltech 40-Meter Laboratory, LIGO-T050086-00-R 6/20/2005]
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/40mDetect_050719.pdf Plans for DC Readout Experiment at the 40m Lab, G050324-00-R, 7/19/05]
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCreadout_InVacLayout.jpg In-vacuum layout drawing]
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DC_Detect_wiring.pdf DC Detection Wiring diagram 8/31/06]
Older versions and block diagrams:
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCdetectWiring.pdf]
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/D060096-00-40M_DC_Detection_Wiring.pdf]
[http://www.ligo.caltech.edu/~swaldman/DitherLock_Strawman_V3.pdf]
See [http://www.ligo.caltech.edu/~rward/dcreadout/ Rob Ward's DC Readout page].
DC readout installation during Vent_Sep_2006
Post-vent Planned Measurements and Procedures
Lessons Learned in preparation for next generation
DC Photodiode Preamp
attachment:DCPD_12_12_06_new.png attachment:DCPD_12_12_06_new.pdf
