Differences between revisions 8 and 16 (spanning 8 versions)
Revision 8 as of 2006-09-14 01:03:30
Size: 1620
Comment:
Revision 16 as of 2006-09-14 17:22:29
Size: 1278
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/40mDCdetect.pdf Proposal for a Homodyne (DC) Detection Experiment at the LIGO Caltech 40-Meter Laboratory, LIGO-T050086-00-R 6/20/2005]
Line 4: Line 5:
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCreadout_InVacLayout.jpg "In-vacuum layout drawing"] [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/40mDetect_050719.pdf Plans for DC Readout Experiment at the 40m Lab, G050324-00-R, 7/19/05]
Line 6: Line 7:
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DC_Detect_wiring.pdf "DC Detection Wiring diagram 8/31/06"] <<ImageLink(http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCreadout_InVacLayout.jpg,width=500)>>
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCreadout_InVacLayout.jpg In-vacuum layout drawing]

[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DC_Detect_wiring.pdf DC Detection Wiring diagram 8/31/06]
Line 9: Line 13:
* [http://www.ligo.caltech.edu/~rward/dcreadout/OOwiring.pdf]
* [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCdetectWiring.pdf]
* [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/D060096-00-40M_DC_Detection_Wiring.pdf]
* [http://www.ligo.caltech.edu/~swaldman/DitherLock_Strawman_V3.pdf]
 * [http://www.ligo.caltech.edu/~rward/dcreadout/OOwiring.pdf]
 * [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCdetectWiring.pdf]
 * [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/D060096-00-40M_DC_Detection_Wiring.pdf]
 * [http://www.ligo.caltech.edu/~swaldman/DitherLock_Strawman_V3.pdf]
Line 18: Line 22:
ElectronicsSchematics
Line 22: Line 28:
Lessons learned in prep for next generation [[Lessons Learned]] [[Lessons Learned]] in preparation for next generation
Line 25: Line 31:
= Next Generation DC Readout Notes =
 * Put the resistors on the PD block, not the nipple.
 * Wider separation for the PDs so the ghost beam can get wedged out.
 * Black glass ring around the PD cans to catch the 1st ghost beam.
 * Black glass dumps all over the place for the leak throughs. Optic mounts should have their own dumps.
 * Don't use any of the Piezo-Jena crap.
 * Don't use copper for the OMC body. All fused-silica, all the time.
 * Don't use a teensy mirror in the OMC. Calculate the needed resonant frequency.
 * Make both curved mirrors on a OMMT movable? And Bigger?
 * always draw ALL the dogs for EVERYTHING
 * CVI mirrors coated for 45P don't get better than ~98% reflectivity
 * Is it OK to change to use a fused silica baseplate with optically contacted mirrors?

DC_Readout (last edited 2012-01-03 23:02:39 by localhost)