Differences between revisions 4 and 17 (spanning 13 versions)
Revision 4 as of 2006-09-13 19:51:59
Size: 1258
Editor: DanielBusby
Comment:
Revision 17 as of 2006-09-14 23:15:11
Size: 1277
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/40mDCdetect.pdf Proposal for a Homodyne (DC) Detection Experiment at the LIGO Caltech 40-Meter Laboratory, LIGO-T050086-00-R 6/20/2005]

[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/40mDetect_050719.pdf Plans for DC Readout Experiment at the 40m Lab, G050324-00-R, 7/19/05]

<<ImageLink(http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCreadout_InVacLayout.jpg,width=500)>>
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCreadout_InVacLayout.jpg In-vacuum layout drawing]

[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DC_Detect_wiring.pdf DC Detection Wiring diagram 8/31/06]

Older versions and block diagrams:
 * [http://www.ligo.caltech.edu/~rward/dcreadout/OOwiring.pdf]
 * [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCdetectWiring.pdf]
 * [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/D060096-00-40M_DC_Detection_Wiring.pdf]
 * [http://www.ligo.caltech.edu/~swaldman/DitherLock_Strawman_V3.pdf]
Line 5: Line 20:
http://www.ligo.caltech.edu/~rward/dcreadout/OOwiring.pdf OutputModeCleaner
Line 7: Line 22:
Rob's controls block diagram: http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCdetectWiring.pdf

Jay's wiring diagram D060096 3/30/06: http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/D060096-00-40M_DC_Detection_Wiring.pdf

Sam's schematic alignment digital controls http://www.ligo.caltech.edu/~swaldman/DitherLock_Strawman_V3.pdf

OutputModeCleaner
DCReadoutElectronics
Line 18: Line 27:

[[Lessons Learned]] in preparation for next generation
Line 19: Line 31:
= Next Generation DC Readout Notes =
 * Put the resistors on the PD block, not the nipple.
 * Wider separation for the PDs so the ghost beam can get wedged out.
 * Black glass ring around the PD cans to catch the 1st ghost beam.
 * Black glass dumps all over the place for the leak throughs. Optic mounts should have their own dumps.
 * Don't use any of the Piezo-Jena crap.
 * Don't use copper for the OMC body. All fused-silica, all the time.
 * Don't use a teensy mirror in the OMC.
 * Make both curved mirrors on a OMMT movable?
 * always draw ALL the dogs for EVERYTHING
 * CVI mirrors coated for 45P don't get better than ~98% reflectivity

Version 0.1 DC Readout / OMC System


[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/40mDCdetect.pdf Proposal for a Homodyne (DC) Detection Experiment at the LIGO Caltech 40-Meter Laboratory, LIGO-T050086-00-R 6/20/2005]

[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/40mDetect_050719.pdf Plans for DC Readout Experiment at the 40m Lab, G050324-00-R, 7/19/05]

http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCreadout_InVacLayout.jpg [http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCreadout_InVacLayout.jpg In-vacuum layout drawing]

[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DC_Detect_wiring.pdf DC Detection Wiring diagram 8/31/06]

Older versions and block diagrams:

See [http://www.ligo.caltech.edu/~rward/dcreadout/ Rob Ward's DC Readout page].

OutputModeCleaner

DCReadoutElectronics

Stuff We Need to Get

Vacuum opening Plan of Action

Lessons Learned in preparation for next generation


DC_Readout (last edited 2012-01-03 23:02:39 by localhost)