|
Size: 1277
Comment:
|
Size: 1318
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 28: | Line 28: |
| [[Planned Measurements and Procedures]] |
Version 0.1 DC Readout / OMC System
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/40mDCdetect.pdf Proposal for a Homodyne (DC) Detection Experiment at the LIGO Caltech 40-Meter Laboratory, LIGO-T050086-00-R 6/20/2005]
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/40mDetect_050719.pdf Plans for DC Readout Experiment at the 40m Lab, G050324-00-R, 7/19/05]
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCreadout_InVacLayout.jpg In-vacuum layout drawing]
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DC_Detect_wiring.pdf DC Detection Wiring diagram 8/31/06]
Older versions and block diagrams:
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCdetectWiring.pdf]
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/D060096-00-40M_DC_Detection_Wiring.pdf]
[http://www.ligo.caltech.edu/~swaldman/DitherLock_Strawman_V3.pdf]
See [http://www.ligo.caltech.edu/~rward/dcreadout/ Rob Ward's DC Readout page].
Vacuum opening Plan of Action
Planned Measurements and Procedures
Lessons Learned in preparation for next generation
