Differences between revisions 12 and 23 (spanning 11 versions)
Revision 12 as of 2006-09-14 01:07:03
Size: 832
Comment:
Revision 23 as of 2007-06-07 07:44:42
Size: 1376
Editor: TobinFricke
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
[[Laser Noise Couplings]]
Line 4: Line 5:
[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/40mDCdetect.pdf Proposal for a Homodyne (DC) Detection Experiment at the LIGO Caltech 40-Meter Laboratory, LIGO-T050086-00-R 6/20/2005]

[http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/40mDetect_050719.pdf Plans for DC Readout Experiment at the 40m Lab, G050324-00-R, 7/19/05]

<<ImageLink(http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCreadout_InVacLayout.jpg,width=500)>>
Line 18: Line 24:
[[DC Readout Electronics]]
Line 20: Line 28:
Vacuum opening [[Plan of Action]] DC readout installation during [[Vent_Sep_2006]]
Line 22: Line 30:
Lessons learned in prep for next generation [[Lessons Learned]] Post-vent [[Planned Measurements and Procedures]]

[[
Lessons Learned]] in preparation for next generation

DC_Readout (last edited 2012-01-03 23:02:39 by localhost)